PLM03-02998
| Final | 6/22/2004 | 6/23/2004 | 6/23/2004 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 6/22/2004 at 3:42:22 PM. Contact: ###-####. final utility contractor permit, expose floor sink in kitchen in B wing and floor drain in science lab in A wing, pvb required on all eye washes where hose can be submerged in sink, set all fixtures. 6/23/2004 9:23:43 AM
|
PLM04-01664
| Plumbing Rough-in | 6/22/2004 | 6/23/2004 | 6/23/2004 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 6/22/2004 at 6:15:08 PM. Contact: ###-####. ri ok 6/23/2004 9:56:32 AM
|
PLM04-01665
| Plumbing Rough-in | 6/22/2004 | 6/23/2004 | 6/23/2004 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 6/22/2004 at 6:16:02 PM. Contact: ###-####. ri ok 6/23/2004 9:56:26 AM
|
PLM04-01487
| Final | 6/23/2004 | 6/23/2004 | 6/23/2004 12:00:00 AM | P | PASS |
|
|
mop sink as an indirect waste receptor and 4 units to saw waste.
|
PLM04-01487
| Final | 6/17/2004 | 6/23/2004 | 6/23/2004 12:00:00 AM | P | PART |
|
|
sinks ok but needs pvb on mask washer 6/23/2004 2:52:04 PM
|
PLM04-01692
| Water and/or Sewer | 6/22/2004 | 6/23/2004 | 6/23/2004 12:00:00 AM | P | PASS |
|
|
bill. Ron , U-save will call you in A.M. to update. sewer final ok 6/23/2004 3:24:29 PM
|