FIR03-00814
| INSP-Sprinkler Rough-in/Hydro | 6/22/2004 | 6/23/2004 | 6/23/2004 12:00:00 AM | A | FAIL |
|
|
Johnathon; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes UG hydro failed; will still need to flush 6/23/2004 1:59:57 PM
|
FIR04-00174
| INSP-Sprinkler Rough-in/Hydro | 6/22/2004 | 6/23/2004 | 6/23/2004 12:00:00 AM | P | NR |
|
|
Johnathon -- please call first; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes Will reschedule for overhead hydro 6/23/2004 2:00:30 PM
|
FIR04-00284
| INSP-Final Inspection | 6/22/2004 | 6/23/2004 | 6/23/2004 12:00:00 AM | P | PASS |
|
|
Kerry; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes G4A QR sprinklers were installed in this space and lobby 6/23/2004 3:00:16 PM
|
FIR04-00317
| INSP-Final Inspection | 6/23/2004 | 6/23/2004 | 6/23/2004 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 6/23/2004 at 7:34:51 AM. Contact: ###-####. The terminal cabinet on the 6th floor was used to make connection to the spreaker circuit from the 5th floor speaker amplifier 6/23/2004 3:02:42 PM
|
BLD04-00680
| FIRE-Final Inspection | 6/23/2004 | 6/23/2004 | 6/23/2004 12:00:00 AM | P | PASS |
|
|
shawn; Phone #: ###-#### Internet Inspection Request from: Barbara Moore Will have door hardware on restroom for structural inspector (school supplies hardware) 6/23/2004 2:24:44 PM
|
BLD04-00310
| FIRE-Final Inspection | 6/23/2004 | 6/23/2004 | 6/23/2004 12:00:00 AM | P | PASS |
|
|
The rated door to lobby and rated glazing wasn't installed; will have installed for structural inspector 6/23/2004 3:05:19 PM
|
FIR03-00696
| INSP-Final Inspection | 6/23/2004 | 6/23/2004 | 6/23/2004 12:00:00 AM | P | PASS |
|
|
|
FIR03-00343
| INSP-Sprinkler Rough-in/Hydro | 6/18/2004 | 6/23/2004 | 6/22/2004 3:00:39 PM | A | CANC |
|
|
Contact: Terry -- This is scheduled with the ISFM and pump guy for 10 am.; Phone #: ###-#### Internet Inspection Request from: Alicia Pauley Inspection cancelled from web by: Alicia Pauley
|