Inspections for the day of: Friday, June 23, 2006.
Number of inspections: 12
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorForrest France
TitleFIRE INSPECTOR
Phone #794-1981
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD03-02347 BLD-Aging Inspection6/23/20066/23/20066/26/2006 3:03:35 PM DONE
Project final pending fire alarm work c/n issued to NWFS.
FIR06-00344 INSP-Final Inspection6/23/20066/23/20066/26/2006 12:17:55 PMPPASS
Fire sprinkler final inspection passed.
FIR06-00018 INSP-Final Inspection6/22/20066/23/20066/26/2006 8:24:06 AMPNR
Per contractor, project to be rescheduled for 6/26 inspection.
FIR06-00458 INSP-Final Inspection6/23/20066/23/20066/26/2006 8:22:44 AMPDEFR
Inspection to be rescheduled for 6/26
BLD06-01341 FIRE-Final Inspection6/23/20066/23/20066/23/2006 2:55:31 PMPCANC
Cancel per GC due to conditions at the building which prevent final testing.
FIR06-00128 INSP-Sprinkler Rough-in/Hydro6/23/20066/23/20066/23/2006 2:53:14 PMPPART
Overhead hydrostatic test of the basement system is satisfactory.
FIR06-00443 INSP-Final Inspection6/22/20066/23/20066/23/2006 2:45:01 PMPPASS
Correction notice items are complete, the hood suppression system operated correctly under test conditions.
BLD06-00514 FIRE-Sprinkler Rough-in6/23/20066/23/20066/23/2006 2:43:50 PMPPART
Need to remove all storage from the No use or occupancy allowed portion of the upstairs areas, exit discharge lights are not installed at this time. Remaining life safety is acceptable.
FIR04-00753 INSP-Final Inspection6/22/20066/23/20066/23/2006 2:40:51 PMPPASS
Two missing escutcheons, hyd. calc sticker, locks a control valves, and antifreeze sign installed while on site. Final inspection passed, permit finaled.
BLD05-02930 FIRE-Final Inspection6/22/20066/23/20066/23/2006 2:37:32 PMPPASS
All items on previous correction notice have been completed, inspection passed.
BLD06-01235 FIRE-Conference6/22/20066/23/20066/23/2006 1:14:51 PMPFAIL
New stair from the 2nd floor office mezzanine is not yet completed, provide approved door hardware at the main entry/exit, provide approved hardware at two office door locations, provide building address numbers of the appropriate size, one attatched exterior canopy is not fire sprinklered (permit pending).
FIR06-00128 INSP-Sprinkler Rough-in/Hydro6/23/20066/23/20066/23/2006 11:02:49 AMAFAIL
Guage read below 200 psi. at the start of test.