BLD07-01932
| BLD-Conference | 6/23/2008 | 6/23/2008 | 6/23/2008 4:36:50 PM | P | PASS |
|
|
nick Phone #: ###-####
|
BLD08-00593
| BLD-Footing | 6/23/2008 | 6/23/2008 | 6/23/2008 3:50:53 PM | P | PART |
|
|
DALE - 1:00 if possible Phone #: ###-#### si to be on site/ no esc permit grouped.
|
BLD08-00921
| BLD-Framing/Rough-in | 6/23/2008 | 6/23/2008 | 6/23/2008 2:26:14 PM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 6/23/2008 at 9:54:56 AM. Contact: ###-####.
|
BLD08-00662
| BLD-Conference | 6/23/2008 | 6/23/2008 | 6/23/2008 2:22:58 PM | P | PASS |
|
|
anonymous phone call that project is not being built to plans. The garage/bonus room is being attached to existing building when plans show it detached. n/a
|
ESC08-00452
| Random Inspection | 6/23/2008 | 6/23/2008 | 6/23/2008 10:40:02 AM | A | PASS |
|
|
|
BLD08-01091
| BLD-Foundation | 6/23/2008 | 6/23/2008 | 6/23/2008 10:39:46 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 6/23/2008 at 5:54:40 AM. Contact: ###-####.
|
BLD07-01960
| BLD-Final | 6/23/2008 | 6/23/2008 | 6/23/2008 10:39:25 AM | A | PASS |
|
|
|
BLD08-00080
| BLD-Framing/Rough-in | 6/20/2008 | 6/23/2008 | 6/23/2008 10:11:00 AM | A | FAIL |
|
|
Bill Phone #: ###-#### clip all sides of grid/ support hvac termanations/
|
BLD08-00079
| BLD-Framing/Rough-in | 6/20/2008 | 6/23/2008 | 6/23/2008 9:07:49 AM | A | CANC |
|
|
john \\epoxy insp.... Phone #: ###-#### need si for insp.
|