FIR08-00117
| INSP-Final Inspection | 6/23/2008 | 6/23/2008 | 6/26/2008 9:48:31 AM | P | NH |
|
|
Larren Phone #: ###-####
|
FIR08-00052
| INSP-Final Inspection | 6/23/2008 | 6/23/2008 | 6/23/2008 4:51:08 PM | P | PASS |
|
|
Fire sprinkler permit finaled.
|
FIR08-00121
| INSP-Final Inspection | 6/23/2008 | 6/23/2008 | 6/23/2008 4:49:31 PM | P | FAIL |
|
|
See five item correction notice for defficient items.
|
FIR08-00329
| INSP-Sprinkler Rough-in | 6/23/2008 | 6/23/2008 | 6/23/2008 4:48:07 PM | P | NR |
|
|
Tenant work is not yet completed for rough-in inspection.
|
FIR08-00328
| INSP-Sprinkler Rough-in | 6/23/2008 | 6/23/2008 | 6/23/2008 4:47:14 PM | P | NR |
|
|
mike Phone #: ###-####
|
BLD08-00655
| FIRE-Final Inspection | 6/23/2008 | 6/23/2008 | 6/23/2008 1:20:42 PM | P | PASS |
|
|
Repairs made as per Troy Cobbley's last inspection.KR
|
BLD08-01035
| BLD-Conference | 6/23/2008 | 6/23/2008 | 6/23/2008 12:59:00 PM | P | PASS |
|
|
Exit signs did not work when test button was pushed, Owners will repair. Tony Young will verify that the exit lights work during his inspection. All other life safety inspection completed. KR
|
FIR08-00430
| INSP-Final Inspection | 6/20/2008 | 6/23/2008 | 6/23/2008 12:48:39 PM | P | PASS |
|
|
Sprinkler quick permit finaled. KR
|
FIR07-00863
| INSP-Sprinkler Rough-in | 6/23/2008 | 6/23/2008 | 6/23/2008 12:48:24 PM | P | PART |
|
|
Inspection for overhead antifreeze and wet systems at the second floor level completed acceptable, as-built plans for field changes at the antifreeze system okayed, see dated initials on plans. NOTE: cover approval pending inspection for tenting when finished.
|
FIR08-00327
| INSP-Sprinkler Rough-in | 6/23/2008 | 6/23/2008 | 6/23/2008 12:43:34 PM | P | PART |
|
|
See city stamped plan set for location of one overspaced head at the entry vestibule to be relocated, tenting is not completed for wet system cold cavity protection at this time, remainder of OH install at the tenant area is satisfactory although not yet approved for cover.
|
FIR08-00418
| INSP-Sprinkler Rough-in/Hydro | 6/23/2008 | 6/23/2008 | 6/23/2008 12:38:08 PM | A | NR |
|
|
Jim Phone #: ###-####
|
BLD07-01932
| FIRE-Conference | 6/23/2008 | 6/23/2008 | 6/23/2008 12:35:47 PM | P | DONE |
|
|
Done in conjunction with project related fire alarm testing. Discussed job finish schedule, elevator upgrade completion date, access controled door hardware, noted one fire extinguisher overdue annual certification.
|
FIR08-00047
| INSP-Alarm Testing | 6/23/2008 | 6/23/2008 | 6/23/2008 10:58:15 AM | A | PART |
|
|
See correction notice for list of items in need of revision.
|
BLD07-01188
| FIRE-Final Inspection | 6/23/2008 | 6/23/2008 | 6/23/2008 10:55:12 AM | P | NR |
|
|
Fire life safety final cannot be completed until project related alarm and sprinkler permits are finaled-see details listed in FIR permit activities for specific items remaining.
|
FIR08-00121
| INSP-Alarm Testing | 6/20/2008 | 6/23/2008 | 6/23/2008 10:51:44 AM | A | FAIL |
|
|
Provide map at the FACP, missing signage at the door to the fire alarm panel room, provide visual notification for the women's fitting room vestibule per plan review annotations, door mag locks at the south and north exits are not installed at this time for functional testing of interconnection to the fire alarm system, noted RTU #3 duct detector is not operational at the factory installed supply side (return side is okay), addresses at RTU # 1 amendend while on site, will sign record of completion forms when c/n items are finished, remainder of fire alarm work test passed including signal monitoring.
|
FIR07-00997
| INSP-Final Inspection | 6/20/2008 | 6/23/2008 | 6/23/2008 10:42:04 AM | A | FAIL |
|
|
Provide certification for the RPB, relocate the automatic ball drip for the fire dept. connection, provide missing "911" sign at the outside bell, provide pitot and playpipe for functional forward flow testing per review notes, need to attatch calc stickers, riser signage, state tag etc.
|
BLD08-01265
| FIRE-Final Inspection | 6/20/2008 | 6/23/2008 | 6/20/2008 12:59:37 PM | A | CANC |
|
|
josh Phone #: ###-#### Inspection cancelled from web by: Alexandra Rahn
|