Inspections for the day of: Thursday, June 23, 2011.
Number of inspections: 12
Percentage of inspections complete: 83 %
Percentage of inspections not complete: 17 %
Contact Information
InspectorForrest France
TitleFIRE INSPECTOR
Phone #794-1981
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR11-00219 INSP-Alarm Testing6/16/20116/17/2011 A 
Phone #: ###-#### >> Inspection requested via web by Robert Gobler
FIR11-00025 INSP-Final Inspection6/22/20116/22/2011 P 
Troy phone #: ###-####
FIR10-00137 INSP-Final Inspection6/20/20116/23/20116/24/2011 4:34:46 PMPPART
Completed testing of ID and DD at the first, second and third floors.
FIR11-00289 INSP-Sprinkler Rough-in6/22/20116/23/20116/23/2011 5:01:55 PMPPART
See plans marked with today's date for areas inspected. Provide seismic clearance at the intersection of the floor and new 2' line.
FIR11-00264 INSP-Sprinkler Rough-in6/22/20116/23/20116/23/2011 4:59:29 PMAPART
Overhead fire sprinkler work passed rough-in inspection.
BLD11-00865 FIRE-Final Inspection6/22/20116/23/20116/23/2011 4:28:57 PMPPASS
Life safety inspection passed.
BLD11-01363 FIRE-Final Inspection6/22/20116/23/20116/23/2011 4:27:44 PMAPASS
Fire life safety okay pending approved door hardware at two locations- to be verified by structural inspector prior to final.
BLD11-00101 FIRE-Conference6/22/20116/23/20116/23/2011 12:41:51 PMADONE
Alan phone #: ###-#### Regarding knox box location.
FIR11-00159 INSP-Sprinkler Rough-in6/21/20116/23/20116/23/2011 12:40:26 PMADONE
Reference inspection notes per T. Frost completed 6/22.
BLD11-00037 FIRE-Final Inspection6/22/20116/23/20116/23/2011 12:36:54 PMAPASS
Fire life safety inspection completed acceptable. One EM light repaired while on site, signage at the electrical room and elevator lobbies to be posted as discussed.
FIR11-00131 INSP-Final Inspection6/22/20116/23/20116/23/2011 12:34:37 PMAPASS
Fire alarm work passed final inspection and testing. Correction items finished, one FSD repaired while on site. As-built drawings recieved.
BLD11-01191 FIRE-Final Inspection6/22/20116/23/20116/23/2011 12:31:05 PMAPASS
Noted correction item verified for compliance. Life safety passed.