BLD14-00402
| FIRE-Final Inspection | 6/20/2014 | 6/23/2014 | 6/23/2014 3:30:49 PM | P | FAIL |
|
|
Need fire lane signs as per the fire dept review comments.
|
FIR13-00697
| INSP-Sprinkler Rough-in | 6/23/2014 | 6/23/2014 | 6/23/2014 3:28:16 PM | P | PASS |
|
|
Lab and Equipment rooms sprinklers are complete. Piping in lobby area ok to cover. See city approved plans.
|
FIR13-00460
| INSP-Sprinkler Rough-in/Hydro | 6/23/2014 | 6/23/2014 | 6/23/2014 1:56:01 PM | P | PASS |
|
|
Underground hydro test passed
|
FIR14-00248
| INSP-Sprinkler Rough-in | 6/23/2014 | 6/23/2014 | 6/23/2014 1:55:25 PM | P | PART |
|
|
24 hour air test started at 12:30 with 44 psi
|
BLD14-00484
| FIRE-Final Inspection | 6/23/2014 | 6/23/2014 | 6/23/2014 8:32:51 AM | P | PART |
|
|
Life safety in phase 2 and 3 passed.
|