Inspections for the day of: Friday, June 23, 2017.
Number of inspections: 22
Percentage of inspections complete: 95 %
Percentage of inspections not complete: 5 %
Contact Information
InspectorJim Sly
TitleBLD-COM/RES INSPECTOR
Phone #794-9465
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
MIS17-00191 BLD-Conference6/15/20176/20/2017 P 
Check back.
BLD16-04518 BLD-Final6/22/20176/23/20176/23/2017 4:18:34 PMPNR
Dave Phone #: ###-####
Need Co2 Det.........
BLD16-04518 BLD-Framing/Rough-in6/22/20176/23/20176/23/2017 4:17:52 PMPPASS
Dave Phone #: ###-####
BLD17-01073 BLD-Framing/Rough-in6/22/20176/23/20176/23/2017 4:17:20 PMPPASS
Inspection requested via web by Kelly Stover
BLD16-04079 BLD-Footing6/22/20176/23/20176/23/2017 2:34:00 PMPPART
Dave Perkins Phone #: ###-####
Footing for Safety Training Bldg OK pending MTI special inspections, tests and approvals.
BLD17-00617 BLD-Footing6/22/20176/23/20176/23/2017 2:19:18 PMPPASS
footing pour is scheduled for 2:00 Phone #: ###-#### Inspection requested via web by kevin debelloy
NO SPECIAL INSPECTIONS REQUIRED.
BLD17-00557 BLD-Framing/Rough-in6/22/20176/23/20176/23/2017 1:52:24 PMPPART
Vadid Phone #: ###-####
C/N posted.
MIS17-00180 BLD-Conference6/20/20176/23/20176/23/2017 1:51:47 PMPDONE
Permit for shed obtained........need to call for final inspection.
BLD16-04171 BLD-Foundation6/23/20176/23/20176/23/2017 1:50:17 PMPPART
Pat Phone #: ###-####
Walls All OK ........except front stairway walls.
BLD17-01112 BLD-Framing/Rough-in6/23/20176/23/20176/23/2017 1:48:34 PMPPART
Myron Phone #: ###-#### had energy by mistake
OK except.....C/N posted
BLD17-02021 BLD-Conference6/22/20176/23/20176/23/2017 1:47:25 PMAPASS
Phone #: 2088707014 >> Inspection requested via mobile web by Mike Meske
BLD17-01402 BLD-Final6/21/20176/23/20176/23/2017 12:43:09 PMAPASS
Charles Phone #: ###-####
OK for Perm Occ.
MIS17-00179 DOC - Permit Finaled6/23/20176/23/20176/23/2017 12:24:45 PMPPASS
BLD16-02412 BLD-Framing/Rough-in6/22/20176/23/20176/23/2017 11:53:07 AMAPASS
Phone #: ###-#### Inspection requested via web by Mike McHargue
BLD17-00209 BLD-Wall Bracing6/22/20176/23/20176/23/2017 11:26:36 AMAPASS
zak Phone #: ###-####
BLD17-01334 BLD-Footing6/22/20176/23/20176/23/2017 11:04:17 AMAPASS
Tim Phone #: ###-####
Tony inspected and OK'd Sewer line thru footing.
BLD17-00960 BLD-Footing6/22/20176/23/20176/23/2017 10:32:30 AMAPART
michael Phone #: ###-####
Footing OK if placed so that Eve of structure on S. side is min. 3 foot from property line.
BLD17-00317 BLD-Wall Bracing6/23/20176/23/20176/23/2017 9:32:30 AMAPASS
Phone #: 2088598694 >> Inspection requested via mobile web by Brad
BLD17-00860 BLD-Energy code compliance6/22/20176/23/20176/23/2017 9:19:46 AMAPASS
main house // Kevin Phone #: ###-####
BLD16-03883 BLD-Other6/22/20176/23/20176/23/2017 9:02:23 AMAPASS
fire tape sheetrock (between 10-noon) // Sharm Phone #: ###-####
Exterior side of East wall.....5/8 rock installation.....OK.
BLD17-01111 BLD-Energy code compliance6/23/20176/23/20176/23/2017 12:00:00 AMPCANC
Myron Phone #: ###-####
BLD17-01112 BLD-Energy code compliance6/23/20176/23/20176/23/2017 12:00:00 AMPCANC
Myron Phone #: ###-####