ELE20-01986
| Electrical Rough-In | 6/23/2020 | 6/23/2020 | 6/23/2020 3:43:36 PM | P | PASS |
|
|
Screened- Don Phone #: ###-#### Utility and bonus rm addition rough in ok cover.
|
ELE20-01986
| Conference | 6/23/2020 | 6/23/2020 | 6/23/2020 3:43:20 PM | P | PASS |
|
|
Screened- Don Phone #: ###-#### Son in law doing wiring. wiring already installed. very clean work. dicussed TR receptacles
|
ELE20-01076
| Final | 6/23/2020 | 6/23/2020 | 6/23/2020 2:50:07 PM | P | PASS |
|
|
Please call 30 mins ahead for access Phone #: ###-#### Inspection requested via web by John VanZandt Called ahead, Contractor called to inform of arrival, no answer at door, Ogata rep came over and met me on site, opened house, 2 high school age ladies in house. Final ok
|
ELE20-02132
| Electrical Rough-In | 6/23/2020 | 6/23/2020 | 6/23/2020 2:25:16 PM | P | PASS |
|
|
Please give me half an hour notice before inspection to insure access. Thank you Shaun ###-#### Phone #: ###-#### Inspection requested via web by Shaun Kirkman Kitchen, entry, pantry rough in ok cover.
|
ELE20-01233
| Final | 6/23/2020 | 6/23/2020 | 6/23/2020 1:48:33 PM | P | PASS |
|
|
screened // Kevin Phone #: ###-#### Final ok
|
ELE19-02093
| Final | 6/22/2020 | 6/23/2020 | 6/23/2020 12:55:30 PM | P | FAIL |
|
|
Phone #: ###-#### Inspection requested via web by Rem Fox Building permit for sign has expired, unable to inspect work associated with sign without active building permit. Appears conduits added mounted on roof. Must have access to roof for future inspections.
|
ELE20-02107
| Temporary Service | 6/23/2020 | 6/23/2020 | 6/23/2020 11:56:54 AM | P | FAIL |
|
|
Contractor called and stated pole is set on 3rd lot to south of actual lot labelled lot 19 block 53. Unable to verify proper bond, pole energized and bond point in meter base.
|
ELE20-02062
| Temporary Service | 6/22/2020 | 6/23/2020 | 6/23/2020 11:25:35 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Rodney Monroe t/s u/g n ok
|
ELE20-02101
| Temporary Service | 6/22/2020 | 6/23/2020 | 6/23/2020 11:25:02 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Rodney Monroe t/s u/g n ok
|
ELE20-02063
| Temporary Service | 6/22/2020 | 6/23/2020 | 6/23/2020 11:24:31 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Rodney Monroe t/s u/g n ok
|
ELE20-02107
| Temporary Service | 6/21/2020 | 6/23/2020 | 6/23/2020 10:50:24 AM | A | FAIL |
|
|
Phone #: ###-#### Inspection requested via web by Therrin Robertson No pole set.
|
ELE20-02108
| Temporary Service | 6/21/2020 | 6/23/2020 | 6/23/2020 10:49:02 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Therrin Robertson t/s u/g n ok
|
ELE20-02106
| Rough-In Permanent Service | 6/21/2020 | 6/23/2020 | 6/23/2020 10:47:42 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Therrin Robertson Rough in ok cover p/s u/g n ok
|
ELE20-02105
| Rough-In Permanent Service | 6/21/2020 | 6/23/2020 | 6/23/2020 10:46:52 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Therrin Robertson Rough in ok cover p/s u/g n ok
|
ELE19-03829
| Electrical Rough-In | 6/22/2020 | 6/23/2020 | 6/23/2020 9:43:19 AM | A | PASS |
|
|
Rough In Wall inspection for the 2nd floor. Contact electrician Shawn Evins with any questions. Thank you, Phone #: ###-#### Inspection requested via web by Cathy Duchek Level 2 core walls rough in ok cover
|