ELE96-01604
| INSP - T/S and Final | 6/24/1996 | 6/24/1996 | 7/5/1996 12:00:00 AM | P | CANC |
|
|
GAVE TO WRONG INSPECTOR
|
PLM96-01171
| INSP - Plumbing Rough-in | 6/21/1996 | 6/24/1996 | 6/24/1996 12:00:00 AM | A | PASS |
|
|
3 W/C 4 LAV 2 T/SHR 1 SINK 1 W/H 1 C/W correct count r/i o/k 6/24/6 347
|
PLM96-01757
| INSP - Plumbing Rough-in | 6/24/1996 | 6/24/1996 | 6/24/1996 12:00:00 AM | P | FAIL |
|
|
correct count w/c 2 basin 2 tub 2 sink 2 w/b 2 w/h 2 r/i fail 1003--upc instal standards 22.5 316.2.1 1008.4 1005 same as above------and 318 waste test failed 6/24/6 347
|
PLM96-00518
| INSP - Final | 6/24/1996 | 6/24/1996 | 6/24/1996 12:00:00 AM | P | FAIL |
|
|
final fail trap arm for kit too long---over 90 degrees without cleanout count correct w/c 3 basin 3 tub 2 sink 1 w/b 1 w/h 1 6/24/6 347
|