MEC02-00802
| Pressure Test | 6/21/2002 | 6/24/2002 | 6/24/2002 12:00:00 AM | A | FAIL |
|
|
###-#### need gage 6/24/2002 11:08:32 AM
|
BLD02-01147
| BLD-Foundation | 6/21/2002 | 6/24/2002 | 6/24/2002 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 06/21/2002 at 16:13:56. Contact: ###-####. poured 6/24/2002 1:38:42 PM
|
BLD02-01219
| BLD-Framing/Rough-in | 6/24/2002 | 6/24/2002 | 6/24/2002 12:00:00 AM | P | CANC |
|
|
Scheduled by a contractor via Hello! on 06/24/2002 at 08:14:14. Contact: ###-####. Disp set to [CANC] by a contractor via Hello! on 06/24/2002 at 10:01:10.
|
BLD02-00845
| BLD-Final | 6/24/2002 | 6/24/2002 | 6/24/2002 12:00:00 AM | P | NR |
|
|
fn shawn- ###-#### call 1st before insp ...need plbg final 6/24/2002 3:31:07 PM
|
BLD02-01480
| BLD-Other | 6/24/2002 | 6/24/2002 | 6/24/2002 12:00:00 AM | P | PART |
|
|
roof ###-#### jennifer roof done, looks ok 6/24/2002 2:41:27 PM
|
MEC02-01568
| Pressure Test | 6/24/2002 | 6/24/2002 | 6/24/2002 12:00:00 AM | P | PASS |
|
|
pres test????-###-####- lynn- csst to f.p. only, ok 20# 6/24/2002 3:46:37 PM
|
BLD01-00011
| BLD-Conference | 6/24/2002 | 6/24/2002 | 6/24/2002 12:00:00 AM | P | PASS |
|
|
rec'd complete(?) spec insp reports/ affidavit...need further clarification by eng'r...keep c/n
|
BLD99-01404
| BLD-Conference | 6/24/2002 | 6/24/2002 | 6/24/2002 12:00:00 AM | P | CANC |
|
|
w/ rick j...need all sign offs
|
BLD01-02531
| BLD-Conference | 6/24/2002 | 6/24/2002 | 6/24/2002 12:00:00 AM | P | PASS |
|
|
w/ Rick J...need docs onsite
|
BLD00-01771
| BLD-Final | 6/17/2002 | 6/24/2002 | 6/24/2002 12:00:00 AM | P | NR |
|
|
received postcard -###-####- dan-fn called need elec...owner will final? 6/24/2002 4:13:35 PM
|