Inspections for the day of: Monday, June 24, 2002.
Number of inspections: 10
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorCarl Dependahl
TitleBLD-COM/RES INSPECTOR
Phone #794-9492
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
MEC02-00802 Pressure Test6/21/20026/24/20026/24/2002 12:00:00 AMAFAIL
###-#### need gage 6/24/2002 11:08:32 AM
BLD02-01147 BLD-Foundation6/21/20026/24/20026/24/2002 12:00:00 AMAPART
Scheduled by a contractor via Hello! on 06/21/2002 at 16:13:56. Contact: ###-####. poured 6/24/2002 1:38:42 PM
BLD02-01219 BLD-Framing/Rough-in6/24/20026/24/20026/24/2002 12:00:00 AMPCANC
Scheduled by a contractor via Hello! on 06/24/2002 at 08:14:14. Contact: ###-####. Disp set to [CANC] by a contractor via Hello! on 06/24/2002 at 10:01:10.
BLD02-00845 BLD-Final6/24/20026/24/20026/24/2002 12:00:00 AMPNR
fn shawn- ###-#### call 1st before insp ...need plbg final 6/24/2002 3:31:07 PM
BLD02-01480 BLD-Other6/24/20026/24/20026/24/2002 12:00:00 AMPPART
roof ###-#### jennifer roof done, looks ok 6/24/2002 2:41:27 PM
MEC02-01568 Pressure Test6/24/20026/24/20026/24/2002 12:00:00 AMPPASS
pres test????-###-####- lynn- csst to f.p. only, ok 20# 6/24/2002 3:46:37 PM
BLD01-00011 BLD-Conference6/24/20026/24/20026/24/2002 12:00:00 AMPPASS
rec'd complete(?) spec insp reports/ affidavit...need further clarification by eng'r...keep c/n
BLD99-01404 BLD-Conference6/24/20026/24/20026/24/2002 12:00:00 AMPCANC
w/ rick j...need all sign offs
BLD01-02531 BLD-Conference6/24/20026/24/20026/24/2002 12:00:00 AMPPASS
w/ Rick J...need docs onsite
BLD00-01771 BLD-Final6/17/20026/24/20026/24/2002 12:00:00 AMPNR
received postcard -###-####- dan-fn called need elec...owner will final? 6/24/2002 4:13:35 PM