Inspections for the day of: Tuesday, June 24, 2008.
Number of inspections: 10
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorJames Rogers
TitleEROSION CONTROL INSPECTOR
Phone #794-9463
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC07-01511 Tracking Control6/10/20086/24/20086/24/2008 2:12:24 PMAPASS
ESC07-00003 Random Inspection6/17/20086/24/20086/24/2008 1:57:18 PMAFAIL
1. Mud and dirt trackout from construction site entrance on Shoshone.
2. Dirt on sidewalk on Edson and Cassia.
Cleanup of trackout from construction entrance on
Shosone by close of business 6-24-08.
Install BMP at Construction entrance
Cleanup of dirt on sidewalk, gutter on edson, cassia and shoshone by end of day, 6-24-08 or a stop work may be issued.
ESC08-00509 Site Preparation6/24/20086/24/20086/24/2008 10:48:41 AMPPASS
RP ####-####
ESC08-00304 Site Final6/16/20086/24/20086/24/2008 10:43:08 AMAPART
ESC08-00369 Site Preparation6/24/20086/24/20086/24/2008 10:07:50 AMPFAIL
1. ESC BMP's to be placed behind sidewalk to prevent soil from getting on street.
2. Concrete washout area (lined) to be placed on site. No further concrete to be placed until this BMP is completed.
3. Consgtruction site entrance to be constructed using approved BMPs. Trackout on sidewalk and street to be swept.
4. DI protection to be placed on Windsong, downstream from site.
Work to be completed no later than close of b usiness on 6-27-08 or a stop work order will be issued.
ESC08-00099 Site Preparation6/10/20086/24/20086/24/2008 8:55:55 AMAPASS
ESC07-01561 Random Inspection6/16/20086/24/20086/24/2008 8:50:07 AMAPASS
ESC08-00250 Site Final6/16/20086/24/20086/24/2008 8:38:13 AMAPASS
ESC06-01078 Random Inspection6/17/20086/24/20086/23/2008 12:28:38 PMAPASS
ESC07-00711 Tracking Control6/10/20086/24/20086/23/2008 11:24:35 AMACANC