FIR09-00322
| INSP-Final Inspection | 6/24/2009 | 6/24/2009 | 6/24/2009 4:37:39 PM | P | PASS |
|
|
Permit finaled
|
FIR09-00073
| FIR-Aging Inspection | 6/24/2009 | 6/24/2009 | 6/24/2009 4:04:46 PM | | NR |
|
|
work is in progress
|
FIR08-00585
| INSP-Final Inspection | 6/23/2009 | 6/24/2009 | 6/24/2009 4:04:08 PM | A | PASS |
|
|
Permit finaled
|
FIR08-00390
| INSP-Final Inspection | 6/23/2009 | 6/24/2009 | 6/24/2009 4:03:33 PM | A | PASS |
|
|
Permit finaled
|
FIR09-00097
| INSP-Alarm Testing | 6/24/2009 | 6/24/2009 | 6/24/2009 3:58:26 PM | P | PASS |
|
|
The fire alarm rough-in for the second floor passed. One smoke detector appears to be overspaced from the east fire doors and will be verified at the final.
|
FIR08-00830
| INSP-Sprinkler Rough-in/Hydro | 6/23/2009 | 6/24/2009 | 6/24/2009 3:57:04 PM | A | CANC |
|
|
This was a duplicate inspection which was already performed yesterday.
|
BLD09-00622
| FIRE-Final Inspection | 6/24/2009 | 6/24/2009 | 6/24/2009 12:23:31 PM | P | PASS |
|
|
life safety passed
|
FIR07-01031
| INSP-Sprinkler Rough-in | 6/23/2009 | 6/24/2009 | 6/24/2009 12:20:49 PM | A | PASS |
|
|
See the city approved plans for rooms where the sprinkler piping can be covered
|
FIR07-01032
| INSP-Sprinkler Rough-in/Hydro | 6/23/2009 | 6/24/2009 | 6/24/2009 12:19:44 PM | A | PASS |
|
|
The hydro test for the new piping in skilled nursing, first floor, passed.
|