Inspections for the day of: Wednesday, June 24, 2009.
Number of inspections: 9
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorClint A Smith
TitleEROSION CONTROL INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC09-00329 Site Preparation6/24/20096/24/20096/24/2009 5:38:59 PM FAIL
Verbal to RP:
Provide an approved Drain Inlet Protection on the D.I. in the front of the property. Will re-inspect on 6/26/09 PM.
ESC09-00104 Site Preparation6/24/20096/24/20096/24/2009 3:03:04 PM DONE
ompleted by inspector 420.
ESC09-00353 Site Preparation6/24/20096/24/20096/24/2009 3:02:01 PMPPASS
Jamie Phone #: ###-####
ESC09-00086 Site Preparation6/24/20096/24/20096/24/2009 3:00:45 PM PART
Verbal to RP:
Block off access at the south west end of project area. Will re-inspect on 6/26/09 AM.
ESC09-00339 BMP Violation6/22/20096/24/20096/24/2009 1:43:39 PMPPART
Before any concrete work occurs, a concrete washout pit must be installed.
ESC09-00339 INSP - Stop Work Order6/24/20096/24/20096/24/2009 1:42:59 PMPPASS
on 6/12/09 a stop work order was issued due to working with a permit. A permit has been issued and all pervisions have been installed.
ESC08-01043 General Inspection6/24/20096/24/20096/24/2009 12:23:47 PMPPART
Verbal to RP:
Provide additional access controls along the North end of proprety area not just to restrict access, also to deliniate project boundries. Will re-inspect on 6/25/09 PM.
ESC09-00102 Conference6/19/20096/24/20096/24/2009 11:00:31 AMADONE
Went over final stabilization. Exsorted RP to indicate on his plan map over change of responsiblitity on areas of the project. Will site final once contacted by the RP.
ESC09-00338 Site Preparation6/24/20096/24/20096/24/2009 10:55:32 AM PASS