ESC09-00329
| Site Preparation | 6/24/2009 | 6/24/2009 | 6/24/2009 5:38:59 PM | | FAIL |
|
|
Verbal to RP: Provide an approved Drain Inlet Protection on the D.I. in the front of the property. Will re-inspect on 6/26/09 PM.
|
ESC09-00104
| Site Preparation | 6/24/2009 | 6/24/2009 | 6/24/2009 3:03:04 PM | | DONE |
|
|
ompleted by inspector 420.
|
ESC09-00353
| Site Preparation | 6/24/2009 | 6/24/2009 | 6/24/2009 3:02:01 PM | P | PASS |
|
|
Jamie Phone #: ###-####
|
ESC09-00086
| Site Preparation | 6/24/2009 | 6/24/2009 | 6/24/2009 3:00:45 PM | | PART |
|
|
Verbal to RP: Block off access at the south west end of project area. Will re-inspect on 6/26/09 AM.
|
ESC09-00339
| BMP Violation | 6/22/2009 | 6/24/2009 | 6/24/2009 1:43:39 PM | P | PART |
|
|
Before any concrete work occurs, a concrete washout pit must be installed.
|
ESC09-00339
| INSP - Stop Work Order | 6/24/2009 | 6/24/2009 | 6/24/2009 1:42:59 PM | P | PASS |
|
|
on 6/12/09 a stop work order was issued due to working with a permit. A permit has been issued and all pervisions have been installed.
|
ESC08-01043
| General Inspection | 6/24/2009 | 6/24/2009 | 6/24/2009 12:23:47 PM | P | PART |
|
|
Verbal to RP: Provide additional access controls along the North end of proprety area not just to restrict access, also to deliniate project boundries. Will re-inspect on 6/25/09 PM.
|
ESC09-00102
| Conference | 6/19/2009 | 6/24/2009 | 6/24/2009 11:00:31 AM | A | DONE |
|
|
Went over final stabilization. Exsorted RP to indicate on his plan map over change of responsiblitity on areas of the project. Will site final once contacted by the RP.
|
ESC09-00338
| Site Preparation | 6/24/2009 | 6/24/2009 | 6/24/2009 10:55:32 AM | | PASS |
|
|
|