BLD13-01113
| FIRE-Sprinkler Rough-in | 6/24/2013 | 6/24/2013 | 6/24/2013 5:29:19 PM | A | PART |
|
|
Okay to cover fire sprinkler modifications at the grid ceilings.
|
FIR12-00252
| INSP-Final Inspection | 6/21/2013 | 6/24/2013 | 6/24/2013 5:27:32 PM | P | PART |
|
|
Correction items verified for completion. Scope of work passed field testing. Final pending FIR12-00090 (ref. review notes and project description).
|
BLD13-00341
| FIRE-Final Inspection | 6/24/2013 | 6/24/2013 | 6/24/2013 5:21:18 PM | P | FAIL |
|
|
Painted fire sprinkler heads at five locations will need replaced. Ref. NFPA 13 2010 6.2.6.2.2.
|
BLD11-02317
| FIRE-Final Inspection | 6/21/2013 | 6/24/2013 | 6/24/2013 5:12:21 PM | P | PART |
|
|
Items on the previous correction list are finished with the exception of one junction box cover above the basement level fire panel and plan modification for project related FIR trade work.
|