ELE12-01882
| ELE-Aging Inspection | 6/24/2014 | 6/24/2014 | 6/30/2014 7:19:42 AM | | CANC |
|
|
|
ELE14-01662
| Temporary Service | 6/24/2014 | 6/24/2014 | 6/24/2014 3:04:27 PM | P | PASS |
|
|
Phone #: ###-#### >> Inspection requested via web by daniel bibikov t/s u/g n ok
|
ELE14-01663
| Temporary Service | 6/24/2014 | 6/24/2014 | 6/24/2014 3:03:51 PM | P | PASS |
|
|
Phone #: ###-#### >> Inspection requested via web by daniel bibikov t/s u/g n ok
|
ELE14-01648
| Temporary Service | 6/23/2014 | 6/24/2014 | 6/24/2014 3:02:47 PM | P | PASS |
|
|
Phone #: ###-#### >> Inspection requested via web by Bob Glenn t/s u/g n ok
|
ELE14-01606
| Electrical Rough-In | 6/24/2014 | 6/24/2014 | 6/24/2014 2:29:19 PM | P | FAIL |
|
|
Gary Phone #: ###-#### called structural, said ok to inspect electrical, met contractor told to install nailplates, front door box fill with pan boxes, shall protect cable at attic access, shall move water lines from over panel, did not call for p/s has 3" u/g but no expansion joint
|
ELE14-01440
| Final | 6/23/2014 | 6/24/2014 | 6/24/2014 1:55:35 PM | P | PASS |
|
|
Phone #: ###-#### >> Inspection requested via web by Sheri Lewis correction made, ok final, signed card
|
ELE13-02849
| Final | 6/23/2014 | 6/24/2014 | 6/24/2014 1:43:54 PM | P | PART |
|
|
Partial final inspection. Contact is Alan Krishnek Phone #: ###-#### >> Inspection requested via web by Scott Campbell 4 patient rooms, 1 lab, 1 storage only ok final
|
ELE14-01655
| Electrical Rough-In | 6/24/2014 | 6/24/2014 | 6/24/2014 12:45:19 PM | P | PASS |
|
|
Contact is Dan Stuckart, for underground inspection. Please contact Dan one hour before arriving on site. Phone #: ###-#### >> Inspection requested via web by Scott Campbell ok cover u/g house to outbuilding only
|
ELE14-01169
| Electrical Rough-In | 6/23/2014 | 6/24/2014 | 6/24/2014 12:16:11 PM | A | PASS |
|
|
Phone #: ###-#### >> Inspection requested via web by David Nelson corrections made, ri ok
|
ELE13-03408
| Final | 6/23/2014 | 6/24/2014 | 6/24/2014 11:49:57 AM | A | FAIL |
|
|
mark Phone #: ###-#### met builder, shall fix hid lighting in garage (shall hardwire or move fixture to below receptacle) and 2 receptacles shall be properly wired in basement (shall provide power)
|
ELE14-00876
| Final | 6/23/2014 | 6/24/2014 | 6/24/2014 11:14:24 AM | A | PASS |
|
|
Access code gala, call Dene with any questions. Thank you Phone #: ###-#### >> Inspection requested via web by kim grundhauser ok final
|
ELE14-00249
| Final | 6/23/2014 | 6/24/2014 | 6/24/2014 10:33:54 AM | A | PASS |
|
|
Phone #: ###-#### >> Inspection requested via web by cory carman ok final
|
ELE14-00892
| Final | 6/24/2014 | 6/24/2014 | 6/24/2014 9:37:32 AM | A | PASS |
|
|
Phone #: ###-#### >> Inspection requested via web by Bob Glenn ok final
|
ELE14-00929
| Final | 6/24/2014 | 6/24/2014 | 6/24/2014 9:19:37 AM | A | CANC |
|
|
CODE 4224 ANY ? CALL ###-#### Phone #: ###-#### >> Inspection requested via web by Bob Glenn called, floors being done
|
ELE14-01610
| Electrical Rough-In | 6/23/2014 | 6/24/2014 | 6/24/2014 8:59:41 AM | A | FAIL |
|
|
wall cover - Randy Phone #: ###-#### called, left message, left correction notice, NEC300.4(D) shall provide 1 1/4" from edge of framing member to mc cable, 250.86 shall ground metal boxes, BCC shall complete make-up, shall post address
|
ELE14-01636
| Conference | 6/20/2014 | 6/24/2014 | 6/24/2014 8:32:50 AM | A | DONE |
|
|
Request 8:30 - Thomas Phone #: ###-#### talked about patio wiring and floor heat in lower level, told that if contractor does work he shall pull permit, will call for ri for floor heat
|