Inspections for the day of: Tuesday, June 24, 2014.
Number of inspections: 8
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTroy Cobbley
TitleFIRE INSPECTOR
Phone #794-9483
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD13-01688 FIRE-Final Inspection6/23/20146/24/20146/24/2014 3:36:06 PMPPART
life safety is complete in the Lab, Equipment Room and north half of the remodeled Lobby.
FIR14-00248 INSP-Sprinkler Rough-in6/23/20146/24/20146/24/2014 2:51:21 PMPPASS
24 hour air test passed. All piping can be covered. Rough-in passed for the front and rear canopies.
BLD13-03370 FIRE-Final Inspection6/23/20146/24/20146/24/2014 2:50:18 PMPFAIL
Provide additional smoke detector at the new exit into the mall corridor for the smoke evac system or have the mall engineer approve current setup. Need racking permit scheduled for inspection.
FIR14-00107 INSP-Final Inspection6/23/20146/24/20146/24/2014 2:41:39 PMPPASS
permit finaled
FIR14-00280 INSP-Sprinkler Rough-in6/24/20146/24/20146/24/2014 1:23:50 PMPCANC
Need the inspection latest as possible. partial Rough in for 2nd floor only. James is fitter onsite. if you cant get him call John at ###-#### Phone #: ###-#### >> Inspection requested via web by John Venche Inspection cancelled from web by: John Venche
BLD14-00402 FIRE-Final Inspection6/23/20146/24/20146/24/2014 12:26:17 PMAPASS
life safety passed. Signs have been posted
FIR13-00697 INSP-Final Inspection6/23/20146/24/20146/24/2014 10:28:38 AMAPART
Lab, Equipment Room and Lobby sprinkler work is complete.
FIR14-00279 INSP-Alarm Testing6/23/20146/24/20146/24/2014 8:38:36 AMADONE
Lab, Equipment Room and Lobby fire alarm is complete.