GCB15-00116
| GCB-Framing | 6/23/2016 | 6/24/2016 | 6/24/2016 4:52:47 PM | P | DEFR |
|
|
Mike ###-#### - PHASE 2 - IT room framing insp... Ran out of time....
|
BLD16-01914
| BLD-Framing/Rough-in | 6/24/2016 | 6/24/2016 | 6/24/2016 4:51:32 PM | P | PASS |
|
|
Chris-partial-ceiling next to room 301 and 302 Phone #: ###-####
|
BLD15-03489
| BLD-Concrete | 6/24/2016 | 6/24/2016 | 6/24/2016 4:17:24 PM | A | PART |
|
|
PT suspended slab Pour #2 level 3. SI has been doing periodic inspections all week. SI will be onsite today and for pour. Concrete scheduled for 10 pm tonight. Phone #: ###-#### Inspection requested via web by Jim Williams. Work in progress. ok after special inspection has signed off.
|
BLD15-04496
| BLD-Ceiling Grid Inspection | 6/24/2016 | 6/24/2016 | 6/24/2016 4:16:20 PM | P | PART |
|
|
Rod-kitchen Phone #: ###-####. Grid in kitchen ok. still needs MEP inspections.
|
BLD14-02889
| BLD-Conference | 6/24/2016 | 6/24/2016 | 6/24/2016 3:57:23 PM | P | PASS |
|
|
Fire drywall at exterior west wall at gussets. Phone #: ###-#### Inspection requested via web by Michael Zaccheo
|
BLD16-01956
| BLD-Framing/Rough-in | 6/24/2016 | 6/24/2016 | 6/24/2016 2:36:47 PM | P | PASS |
|
|
|
BLD16-01956
| BLD-Wall Bracing | 6/24/2016 | 6/24/2016 | 6/24/2016 2:33:54 PM | P | PASS |
|
|
|
BLD16-01902
| BLD-Foundation | 6/23/2016 | 6/24/2016 | 6/24/2016 1:53:01 PM | P | PASS |
|
|
Phone #: 2086971241 >> Inspection requested via mobile web by Heron
|
BLD16-01786
| BLD-Foundation | 6/23/2016 | 6/24/2016 | 6/24/2016 1:51:36 PM | P | PASS |
|
|
Phone #: 2086971241 >> Inspection requested via mobile web by Heron
|
BLD16-02231
| BLD-Final | 6/24/2016 | 6/24/2016 | 6/24/2016 1:50:52 PM | P | PART |
|
|
Dave Phone #: ###-####. Ok for temp occ. Needs to provide ADA portion of POS.
|
BLD16-01677
| BLD-Energy code compliance | 6/23/2016 | 6/24/2016 | 6/24/2016 12:35:44 PM | P | PASS |
|
|
Joe Phone #: ###-####
|
BLD16-01677
| BLD-Framing/Rough-in | 6/23/2016 | 6/24/2016 | 6/24/2016 12:35:31 PM | P | PASS |
|
|
Joe Phone #: ###-####
|
BLD16-02132
| BLD-Final | 6/24/2016 | 6/24/2016 | 6/24/2016 11:22:55 AM | P | PASS |
|
|
|
BLD16-01501
| BLD-Conference | 6/23/2016 | 6/24/2016 | 6/24/2016 10:56:24 AM | A | PASS |
|
|
Zack Phone #: ###-####
|
BLD16-01371
| BLD-Framing/Rough-in | 6/23/2016 | 6/24/2016 | 6/24/2016 10:26:43 AM | A | PART |
|
|
Dillon Phone #: ###-####. Fire block flue at 2nd. floor. Tony Young to discuss stair construction wuth contractor.
|
GCB15-00130
| GCB-Final | 6/21/2016 | 6/24/2016 | 6/24/2016 9:39:43 AM | A | NR |
|
|
Derek ###-#### - requested 11a.m. and a call ahead. Fire/life safety final inspection failed.
|
BLD14-03071
| BLD-Other | 6/23/2016 | 6/24/2016 | 6/24/2016 9:37:53 AM | A | PASS |
|
|
sheetrock; Cody Phone #: ###-####. 1st and 2nd floor base layer of 5/8 type x and hat channel for floor ceiling assembly.
|
BLD16-02132
| BLD-Final | 6/23/2016 | 6/24/2016 | 6/24/2016 9:08:17 AM | A | PEND |
|
|
would like call ahead; Devin Phone #: ###-####. Everything ok, needs to resolve address issue.
|
BLD16-01956
| BLD-Wall Bracing | 6/23/2016 | 6/24/2016 | 6/24/2016 8:41:47 AM | A | NR |
|
|
Will Phone #: ###-####. mOved to pm inspection.
|
BLD16-01956
| BLD-Framing/Rough-in | 6/23/2016 | 6/24/2016 | 6/24/2016 8:41:07 AM | A | CANC |
|
|
Will Phone #: ###-####
|