FIR19-00933
| INSP-Sprinkler Rough-in/Hydro | 6/23/2020 | 6/24/2020 | 6/24/2020 2:04:01 PM | A | PASS |
|
|
Second floor Rough in passed and piping can be covered and second floor hydro witnessed.
Phone #: ###-#### Inspection requested via web by Brian Carlisle
|
FIR20-00156
| INSP-Sprinkler Rough-in/Hydro | 6/23/2020 | 6/24/2020 | 6/24/2020 9:55:07 AM | A | PART |
|
|
Overhead hydro for wet system witnessed. Dry system 24 hour air test started at 8:30 with 51psi on the guage. Plan mods are needed for the changes and inspection started over. Need through bolts for the EQ braces as discussed. Need insulation in the space above the riser room as discussed.
Leon is the contact. it is going to be 24hr air on dry and hydro on wet. Thank you sir Phone #: ###-#### Inspection requested via web by jeremiah robison
|