PLM02-01862
| Water and/or Sewer | 6/24/2002 | 6/25/2002 | 6/25/2002 12:00:00 AM | A | NR |
|
|
KIRK ###-#### WATER LINE ONLY this will be the well disconnect and dcva and rp on the boiler feed, must be of material approved for inside the building. 6/24/2002 4:14:57 PM
|
PLM02-01866
| Plumbing Rough-in | 6/24/2002 | 6/25/2002 | 6/25/2002 12:00:00 AM | A | PASS |
|
|
###-####
|
PLM02-01868
| Plumbing Rough-in | 6/25/2002 | 6/25/2002 | 6/25/2002 12:00:00 AM | P | PASS |
|
|
ROB ###-####
|
PLM02-01460
| Final | 6/25/2002 | 6/25/2002 | 6/25/2002 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 06/25/2002 at 08:31:44. Contact: ###-####.
|
PLM01-01597
| Final | 6/25/2002 | 6/25/2002 | 6/25/2002 12:00:00 AM | P | NH |
|
|
Added by Inspector: 330 On 6/25/2002 1:34:39 PM noone around left notice
|
PLM02-01880
| Sprinkler (Final) | 6/25/2002 | 6/25/2002 | 6/25/2002 12:00:00 AM | P | PART |
|
|
Added by Inspector: 330 On 6/25/2002 2:48:54 PM tie in ok
|
PLM01-01597
| Final | 6/21/2002 | 6/25/2002 | 6/25/2002 12:00:00 AM | P | NH |
|
|
early pm ###-#### Sam Arana call first to meet there
|