BLD02-01219
| BLD-Framing/Rough-in | 6/24/2002 | 6/25/2002 | 6/25/2002 12:00:00 AM | A | FAIL |
|
|
Scheduled by a contractor via Hello! on 06/24/2002 at 14:53:28. Contact: ###-####....c/n, hdrs, shear...ok to insul 6/25/2002 12:14:04 PM
|
BLD02-00505
| BLD-Conference | 6/24/2002 | 6/25/2002 | 6/25/2002 12:00:00 AM | A | PART |
|
|
framing wip; rec'd MTI soils report 6/25/2002 9:02:42 AM
|
BLD02-00938
| BLD-Framing/Rough-in | 6/24/2002 | 6/25/2002 | 6/25/2002 12:00:00 AM | A | PART |
|
|
scott- ###-#### in-wall floor pen's ok, elec ok; still need shower drains firestopped. 6/25/2002 11:36:43 AM
|
MIS01-00172
| BLD-Final | 6/24/2002 | 6/25/2002 | 6/25/2002 12:00:00 AM | P | NR |
|
|
###-####...will recall w/ other. 6/25/2002 4:08:47 PM
|
BLD01-02531
| BLD-Final | 6/24/2002 | 6/25/2002 | 6/25/2002 12:00:00 AM | P | CANC |
|
|
###-####
|
BLD99-01404
| BLD-Final | 6/24/2002 | 6/25/2002 | 6/25/2002 12:00:00 AM | P | CANC |
|
|
###-####
|
BLD99-01404
| BLD-Final | 6/21/2002 | 6/25/2002 | 6/25/2002 12:00:00 AM | P | NR |
|
|
###-#### doc...recall w/ other final 6/25/2002 4:09:30 PM
|
BLD01-02531
| BLD-Final | 6/21/2002 | 6/25/2002 | 6/25/2002 12:00:00 AM | P | NR |
|
|
###-#### doc fix fire 6/25/2002 3:21:21 PM
|
BLD02-00708
| BLD-Final | 6/24/2002 | 6/25/2002 | 6/25/2002 12:00:00 AM | P | PASS |
|
|
rick ###-####
|
BLD01-00234
| BLD-Conference | 6/24/2002 | 6/25/2002 | 6/25/2002 12:00:00 AM | P | PART |
|
|
wendell ###-#### hvac not finalled 6/25/2002 5:09:05 PM ? fire?? 6/25/2002 5:09:30 PM
|
BLD01-02821
| BLD-Final | 6/24/2002 | 6/25/2002 | 6/25/2002 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 06/24/2002 at 13:29:42. Contact: ###-####.
|