BLD02-00759
| FIRE-Final Inspection | 6/24/2002 | 6/25/2002 | 6/25/2002 12:00:00 AM | A | FAIL |
|
|
###-#### LISA CALL 1ST need smoke detector within 5 feet of door on hold open 6/25/2002 2:00:22 PM
|
MIS01-00172
| FIR-Final | 6/24/2002 | 6/25/2002 | 6/25/2002 12:00:00 AM | A | PASS |
|
|
###-####
|
BLD01-02531
| FIRE-Final Inspection | 6/24/2002 | 6/25/2002 | 6/25/2002 12:00:00 AM | A | FAIL |
|
|
###-#### penetrations and combustibles above grid ceiling on first floor; second floor has penetrations 6/25/2002 10:00:50 AM
|
BLD99-01404
| FIRE-Final Inspection | 6/24/2002 | 6/25/2002 | 6/25/2002 12:00:00 AM | A | PASS |
|
|
###-####
|
BLD01-02828
| FIRE-Sprinkler Rough-in | 6/24/2002 | 6/25/2002 | 6/25/2002 12:00:00 AM | A | FAIL |
|
|
JIM- ###-#### R/I insulation needs to be stapled to joist or secured 6/25/2002 8:26:12 AM
|
BLD02-00731
| FIRE-Conference | 6/24/2002 | 6/25/2002 | 6/25/2002 12:00:00 AM | A | PART |
|
|
###-#### exit signs to installed as redlined on approved plans 6/25/2002 8:01:34 AM
|
BLD02-00296
| FIRE-Final Inspection | 6/24/2002 | 6/25/2002 | 6/25/2002 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 06/24/2002 at 14:01:21. Contact: ###-####.
|
FIR02-00130
| INSP-Sprinkler Rough-in/Hydro | 6/24/2002 | 6/25/2002 | 6/25/2002 12:00:00 AM | P | FAIL |
|
|
Scheduled by a contractor via Hello! on 06/24/2002 at 14:54:55. Contact: ###-####. eq on main feed and FDC; need walls at AHU in basement 6/25/2002 4:33:54 PM
|
MIS02-00125
| FIR-Final | 6/25/2002 | 6/25/2002 | 6/25/2002 12:00:00 AM | P | PASS |
|
|
gail ###-#### call 1st before insp--
|