MEC02-00253
| Final | 6/24/2002 | 6/25/2002 | 6/25/2002 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 06/24/2002 at 08:59:16. Contact: ###-####.
|
MEC02-01375
| Rough-in | 6/24/2002 | 6/25/2002 | 6/25/2002 12:00:00 AM | A | FAIL |
|
|
r/i- ###-#### pat need comb air..gas line to bed 6" above grade 6/25/2002 1:21:13 PM
|
MEC02-01690
| Rough-in | 6/24/2002 | 6/25/2002 | 6/25/2002 12:00:00 AM | A | NR |
|
|
###-####...###-#### 6/25/2002 10:46:06 AM need plans on site 6/25/2002 10:46:32 AM
|
MEC01-03862
| Final | 6/24/2002 | 6/25/2002 | 6/25/2002 12:00:00 AM | A | PASS |
|
|
###-####
|
MEC02-01640
| Conference | 6/24/2002 | 6/25/2002 | 6/25/2002 12:00:00 AM | A | FAIL |
|
|
DIXIE, THEY WANTED YOU TO COME OUT AS THEY HAVE A DIFFERENT KIND OF FIREPLACE SO TONY SAID TO HAVE THEM CALL YOU FOR A CONF. empire heating didn't install f/p...talked to sam..somebody using their permit 6/25/2002 10:10:34 AM
|
MEC02-00019
| Pressure Test | 6/24/2002 | 6/25/2002 | 6/25/2002 12:00:00 AM | P | PASS |
|
|
PRES TEST- RANDALL- ###-#### two 3/4" lines to attic furnaces ok 6/25/2002 3:20:43 PM
|
MEC02-01714
| Final | 6/24/2002 | 6/25/2002 | 6/25/2002 12:00:00 AM | P | PASS |
|
|
###-####\\water heater..off ustick..before cole 6/25/2002 1:24:15 PM
|
MEC02-01405
| Rough-in | 6/24/2002 | 6/25/2002 | 6/25/2002 12:00:00 AM | P | PART |
|
|
###-#### PRESTON..off ustick before maple grove 6/25/2002 1:23:04 PM ok to cover ceilings upstairs..needs to replace b-vent at 2nd floor..will insulate metal in garage 6/25/2002 4:06:46 PM
|