Inspections for the day of: Tuesday, June 25, 2002.
Number of inspections: 12
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTony Young
TitleBLD-COM/RES INSPECTOR
Phone #794-9462
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD01-02368 BLD-Final6/24/20026/25/20026/25/2002 12:00:00 AMAFAIL
fn rob- ###-#### --gar code is 1527
c/n posted 6/25/2002 12:21:06 PM
BLD02-01490 BLD-Footing6/24/20026/25/20026/25/2002 12:00:00 AMAPART
DAN ###-####
BLD02-00884 BLD-Framing/Rough-in6/24/20026/25/20026/25/2002 12:00:00 AMAFAIL
###-####
c/n posted,, ok to insulate 6/25/2002 11:36:17 AM
MEC02-00206 Final6/25/20026/25/20026/25/2002 12:00:00 AMAPASS
BLD01-02828 BLD-Framing/Rough-in6/24/20026/25/20026/25/2002 12:00:00 AMPNR
JIM ###-#### R/I
MEC02-01321 Rough-in6/25/20026/25/20026/25/2002 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 06/25/2002 at 09:24:49. Contact: ###-####.
MEC02-01321 Pressure Test6/25/20026/25/20026/25/2002 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 06/25/2002 at 09:25:07. Contact: ###-####.
BLD00-03720 BLD-Final6/25/20026/25/20026/25/2002 12:00:00 AMPNR
Scheduled by a contractor via Hello! on 06/25/2002 at 10:22:56. Contact: ###-####.conf. only, need trades signed off 6/25/2002 2:23:09 PM
BLD02-00931 BLD-Framing/Rough-in6/24/20026/25/20026/25/2002 12:00:00 AMPFAIL
RUSSELL ###-####
conf. only on framing, not ready,,, ok to start wiring after permit is obtained 6/25/2002 1:41:37 PM
BLD02-01524 BLD-Final6/24/20026/25/20026/25/2002 12:00:00 AMPPASS
ERIC ###-#### ( roof )
BLD00-02171 BLD-Final6/24/20026/25/20026/25/2002 12:00:00 AMPCANC
received card--call 1st before insp- ###-####-arvella
BLD02-00449 BLD-Framing/Rough-in6/24/20026/25/20026/25/2002 12:00:00 AMPPART
Scheduled by a contractor via Hello! on 06/24/2002 at 13:01:00. Contact: ###-####.
c/n posted,, ok to insulate 6/25/2002 4:00:20 PM