Inspections for the day of: Tuesday, June 25, 2002.
Number of inspections: 11
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorDave Hannah
TitleBLD-COM/RES INSPECTOR
Phone #794-1967
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
MEC02-01595 Final6/19/20026/25/20026/25/2002 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 06/19/2002 at 13:17:55. Contact: ###-####.
BLD02-01491 BLD-Footing6/24/20026/25/20026/25/2002 12:00:00 AMAPASS
anthony ###-####
MEC02-01701 Pressure Test6/24/20026/25/20026/25/2002 12:00:00 AMAPASS
###-#### MIKE
MEC02-01701 Final6/24/20026/25/20026/25/2002 12:00:00 AMAPASS
###-#### MIKE
MEC02-01684 Final6/24/20026/25/20026/25/2002 12:00:00 AMAFAIL
Scheduled by a contractor via Hello! on 06/24/2002 at 16:47:31. Contact: .pressure test failed 6/25/2002 1:25:35 PM
BLD01-02411 BLD-Final6/25/20026/25/20026/25/2002 12:00:00 AMPFAIL
JONNY ###-#### everything is ok but for the final on the plumbing 6/25/2002 4:28:00 PM
BLD02-01508 BLD-Final6/25/20026/25/20026/25/2002 12:00:00 AMPPASS
fn for re-roof-steve ###-#### this is the only inspection done on this project 6/25/2002 2:22:21 PM
BLD02-01229 BLD-Framing/Rough-in6/25/20026/25/20026/25/2002 12:00:00 AMPPASS
JOHN OR ROY ###-#### ok to insulate 6/25/2002 4:27:16 PM
BLD02-01353 BLD-Footing6/25/20026/25/20026/25/2002 12:00:00 AMPDONE
###-#### FRED
BLD02-01353 BLD-Footing6/25/20026/25/20026/25/2002 12:00:00 AMPPASS
###-#### FRED
BLD02-00934 BLD-Framing/Rough-in6/25/20026/25/20026/25/2002 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 06/25/2002 at 10:27:19. Contact: ###-####. ok to insulate 6/25/2002 2:22:40 PM