FIR03-00117
| INSP-Final Inspection | 6/24/2003 | 6/25/2003 | 6/25/2003 9:14:57 AM | P | CANC |
|
|
Scheduled by a contractor via Hello! on 6/24/2003 at 4:55:43 PM. Contact: ###-####. Disp set to [CANC] by a contractor via Hello! on Jun 25 2003 9:14AM.
|
FIR03-00115
| FIR-Aging Inspection | 6/25/2003 | 6/25/2003 | 6/25/2003 12:00:00 AM | | PART |
|
|
this project is still under constrcution 6/25/2003 7:30:45 AM
|
BLD02-02287
| FIRE-Final Inspection | 6/25/2003 | 6/25/2003 | 6/25/2003 12:00:00 AM | A | PASS |
|
|
|
FIR03-00103
| INSP-Final Inspection | 6/25/2003 | 6/25/2003 | 6/25/2003 12:00:00 AM | A | PASS |
|
|
8 heads along east wall removed and another permit is issued for the rest of the coolers; informed Bill Alexander of the scope of the work by doing a site visit 6/25/2003 9:37:29 AM
|
FIR02-00476
| INSP-Alarm Testing | 6/24/2003 | 6/25/2003 | 6/25/2003 12:00:00 AM | A | PASS |
|
|
Rick,
This is the project that we spoke about yesterday. We would like to have you on-site at 7:00 am if at all possible, in order to be out of the county's way when they are ready to begin their day. If there are any problems, please call me on my cell ###-####, or at the office ###-####. Thank you.; Phone #: ###-#### Internet Inspection Request from: Jason Minnick all items on c/n were completed 6/25/2003 7:31:27 AM
|
FIR03-00298
| INSP-Final Inspection | 6/24/2003 | 6/25/2003 | 6/25/2003 12:00:00 AM | A | PASS |
|
|
###-#### installed per plans; okay to cover 6/25/2003 10:08:25 AM
|
FIR03-00175
| INSP-Sprinkler Rough-in/Hydro | 6/24/2003 | 6/25/2003 | 6/25/2003 12:00:00 AM | A | PART |
|
|
john; Phone #: ###-#### Internet Inspection Request from: Barbara Moore hydro on wet system okay 6/25/2003 11:15:05 AM
|
FIR03-00133
| INSP-Supply line flush | 6/24/2003 | 6/25/2003 | 6/25/2003 12:00:00 AM | P | PART |
|
|
Scheduled by a contractor via Hello! on 6/24/2003 at 4:00:39 PM. Contact: ###-####. not a flush; thrust block at base of riser okay; pictures of UG not developed yet 6/25/2003 2:19:25 PM
|
BLD00-03428
| FIRE-Conference | 6/24/2003 | 6/25/2003 | 6/25/2003 12:00:00 AM | P | PART |
|
|
###-#### calvin concourse A and B and the new terminal are now a networked fire alarm system; old terminal doesn't have alarms and the pump and sprinkler system will be left on until the building is ready for demo; outside bell isn't working on the old building 6/26/2003 2:24:29 PM
|