FIR13-00243
| INSP-Sprinkler Rough-in | 6/25/2013 | 6/25/2013 | 6/25/2013 4:31:43 PM | P | PART |
|
|
Inspection for cold cavity protection completed, okayed to cover.
|
FIR13-00241
| INSP-Final Inspection | 6/24/2013 | 6/25/2013 | 6/25/2013 4:30:17 PM | P | PASS |
|
|
Functional testing completed. Inspection passed, fire alarm permit final approved.
|
FIR13-00240
| INSP-Final Inspection | 6/24/2013 | 6/25/2013 | 6/25/2013 4:29:42 PM | P | PASS |
|
|
Functional testing completed. Inspection passed, fire alarm permit finaled.
|
FIR13-00225
| INSP-Final Inspection | 6/25/2013 | 6/25/2013 | 6/25/2013 2:57:58 PM | P | PASS |
|
|
Fire sprinkler permit finaled.
|
FIR13-00225
| INSP-Sprinkler Rough-in | 6/25/2013 | 6/25/2013 | 6/25/2013 2:57:03 PM | P | PART |
|
|
Rough-in inspection completed and passed.
|
BLD12-03301
| FIRE-Final Inspection | 6/25/2013 | 6/25/2013 | 6/25/2013 2:44:53 PM | P | PASS |
|
|
Life safety finaled.
|
FIR13-00234
| INSP-Sprinkler Rough-in | 6/25/2013 | 6/25/2013 | 6/25/2013 2:20:33 PM | P | PART |
|
|
See approved plans for clouded and dated areas okayed for sheetrock ceiling cover.
|
FIR13-00224
| INSP-Final Inspection | 6/25/2013 | 6/25/2013 | 6/25/2013 1:30:02 PM | P | PASS |
|
|
Verified plan modification to include additional SW heads at the entry vestibule. Field inspection passed, permit finaled.
|
FIR13-00239
| INSP-Sprinkler Rough-in | 6/24/2013 | 6/25/2013 | 6/25/2013 12:27:16 PM | A | PART |
|
|
Fire sprinkler work above the grid ceiling areas throughout are approved for cover.
|
FIR13-00236
| INSP-Sprinkler Rough-in | 6/24/2013 | 6/25/2013 | 6/25/2013 12:24:22 PM | A | PART |
|
|
Overhead fire sprinkler modifications at bullpen room 208F approved for ceiling cover.
|
FIR13-00235
| INSP-Sprinkler Rough-in | 6/24/2013 | 6/25/2013 | 6/25/2013 12:20:44 PM | A | PART |
|
|
Overhead fire sprinkler work at room 104B okay to cover.
|
BLD12-00452
| FIRE-Final Inspection | 6/24/2013 | 6/25/2013 | 6/25/2013 12:00:00 AM | A | CANC |
|
|
JR-After 10:00 please Phone #: ###-####
|
BLD13-00341
| FIRE-Final Inspection | 6/25/2013 | 6/25/2013 | 6/25/2013 12:00:00 AM | P | CANC |
|
|
Jeff-Please call for access Phone #: ###-####-- cancled per Jeff at Belfor 6/25/13 at 11:53, called inspector//leg
|