ESC13-00576
| BMP Violation | 6/24/2013 | 6/25/2013 | 7/1/2013 11:52:36 AM | P | FAIL |
|
|
Sweep gutter and complete phase I. Spoke with RP on site. RP said the ball is rolling for completion of phase I. Owner has requested estimate from them to install blankets.
|
ESC12-00023
| General Inspection | 6/25/2013 | 6/25/2013 | 6/26/2013 3:04:02 PM | | FAIL |
|
|
Silt fence needs maintained
|
ESC12-01028
| General Inspection | 6/25/2013 | 6/25/2013 | 6/25/2013 2:01:26 PM | | PASS |
|
|
|
ESC13-00232
| BMP Violation | 6/21/2013 | 6/25/2013 | 6/25/2013 1:24:50 PM | A | FAIL |
|
|
Written correction notice issue: limits of disturbance exceeded approved limits of disturbance. Adjacent property must be returned to pre-existing condition and stablization maintained until vegetation is established. Sweep sediment from gutter; a stabilized construction exit will be required if tracking continues as per plan.
|