FIR13-00542
| INSP-Final Inspection | 6/24/2014 | 6/25/2014 | 6/27/2014 1:49:28 PM | P | DONE |
|
|
|
FIR14-00353
| INSP-Sprinkler Rough-in | 6/25/2014 | 6/25/2014 | 6/27/2014 1:48:36 PM | P | PART |
|
|
Okay to cover overhead fire sprinkler work. Tenting 2nd floor okayed. Need to provide intermediate temp heads at the furnace closets.
|
FIR14-00280
| INSP-Sprinkler Rough-in | 6/24/2014 | 6/25/2014 | 6/25/2014 4:05:42 PM | P | PART |
|
|
Second floor fire sprinkler work passed cover inspection with the exception of one overspaced area in the corridor. Also noted one damaged head to be replaced. Locations marked and dated on approved plans.
|
BLD13-03370
| FIRE-Final Inspection | 6/24/2014 | 6/25/2014 | 6/25/2014 4:02:04 PM | P | PASS |
|
|
Noted corrections completed. Fire life safety finaled.
|
FIR14-00269
| INSP-Sprinkler Rough-in | 6/25/2014 | 6/25/2014 | 6/25/2014 4:01:21 PM | P | PART |
|
|
Sheetrock soffits as dated on plans okayed for cover. Modifications at the atrium area to show on plan mod., need to add one head below ductwork at the concealed space per discussion.
|
BLD14-00699
| FIRE-Final Inspection | 6/25/2014 | 6/25/2014 | 6/25/2014 2:26:21 PM | P | PASS |
|
|
Fire life safety inspection passed. Need to post max occupant load signage per plan review at the A-3 area prior to structural final.
|
FIR14-00387
| INSP-Sprinkler Rough-in | 6/25/2014 | 6/25/2014 | 6/25/2014 1:58:46 PM | P | DEFR |
|
|
Installation to match plans as discussed.
|
BLD13-03281
| FIRE-Conference | 6/24/2014 | 6/25/2014 | 6/25/2014 1:57:43 PM | P | DONE |
|
|
Tom Phone #: ###-#### *Completed by C. Hanson*
|
FIR14-00353
| INSP-Sprinkler Rough-in/Hydro | 6/24/2014 | 6/25/2014 | 6/25/2014 1:55:34 PM | A | PART |
|
|
OH hydrostatic test completed satisfactory. Tenting needs adjusted at the second floor south apt.
|
FIR14-00228
| INSP-Conference | 6/24/2014 | 6/25/2014 | 6/25/2014 12:09:17 PM | A | DONE |
|
|
Regarding fire sprinkler coverage
|
FIR14-00275
| INSP-Final Inspection | 6/25/2014 | 6/25/2014 | 6/25/2014 11:14:41 AM | P | CANC |
|
|
Robert is the contact. Thanks Phone #: ###-#### >> Inspection requested via web by Stan Beus Inspection cancelled from web by: Stan Beus
|
BLD14-01677
| FIRE-Final Inspection | 6/24/2014 | 6/25/2014 | 6/25/2014 10:24:14 AM | A | PASS |
|
|
Life safety approved pending door hardware at the back warehouse exit meets plan review conditions. To be completed prior to structural final.
|
FIR14-00264
| INSP-Final Inspection | 6/24/2014 | 6/25/2014 | 6/25/2014 10:21:45 AM | A | PART |
|
|
Overhead fire sprinkler work at the clouded areas as marked and dated on approved plans in phase two and three approved for ceiling cover.
|
FIR14-00275
| INSP-Final Inspection | 6/24/2014 | 6/25/2014 | 6/25/2014 10:16:17 AM | A | CANC |
|
|
Robert is the contact. Thanks Phone #: ###-#### >> Inspection requested via web by Stan Beus Inspection cancelled from web by: Stan Beus
|
BLD14-00653
| FIRE-Final Inspection | 6/24/2014 | 6/25/2014 | 6/25/2014 7:14:16 AM | A | NR |
|
|
Need project related hood suppression system permit, hood inspection and final prior to building fire life safety approval. Refer to fire code review notes items #3 and 4 for details. Also discussed life safety inspection items including door hardware, exit signs, EM lighting, PFE.
|