Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC14-00468 Conference6/25/20146/25/20146/25/2014 3:59:39 PMPPASS
RP-GC Gene returned call and said the street sidewalks and gutters on Skene and St. Patrick Street have been swept.
ESC13-00913 Aging Inspection6/25/20146/25/20146/25/2014 1:56:17 PM PASS
Finaled.
ESC13-00913 DOC - Permit Finaled6/25/20146/25/20146/25/2014 1:55:56 PMPPASS
Homeowner project is complete and all loose sediment stabilized. No trackout to Hill Road. BLD finaled. NO further ESC inspections required.
ESC14-00193 General Inspection6/25/20146/25/20146/25/2014 1:43:29 PM PEND
No activity yet for Old Boise sidewalk project. No site prep requested at this time.
ESC14-00192 General Inspection6/25/20146/25/20146/25/2014 1:41:32 PM PEND
No activity yet for Old Boise sidewalk project. No site prep requested at this time.
ESC14-00187 General Inspection6/25/20146/25/20146/25/2014 1:41:13 PM PEND
No activity yet for Old Boise sidewalk project. No site prep requested at this time.
ESC14-00154 General Inspection6/25/20146/25/20146/25/2014 1:30:23 PM PASS
No activity at time of inspection. Sidewalk and gutter are very clean, no sediment or trackout from site. The lot has been grubbed, but the wall is not yet installed.
ESC14-00468 Random Inspection6/25/20146/25/20146/25/2014 1:15:13 PMPFAIL
Foundation work is ongoing. Contractors getting dirt in street and covering sidewalk. Verbal request to employee to sweep up at end of day and also voicemail left on RP/GC Gene Harding's phone.
ESC13-00857 Aging Inspection6/25/20146/25/20146/25/2014 1:01:09 PM PASS
Finaled.
ESC13-00857 DOC - Permit Finaled6/25/20146/25/20146/25/2014 1:00:51 PMPPASS
House complete and landscaped. Active projects in area will address sediment across street. BLD permit finaled. ESC condtions met.
ESC14-00019 Complaint Inspection6/25/20146/25/20146/25/2014 12:47:00 PMPPASS
Complaint called in that painters were washing out buckets next to street.

Arrived at site and no paint have flowed to street or the storm drain at corner of La Pointe and Royal. Talked to painter and stated that washout must be contained and disposed of properly.

He stated the builder owners teenage son was helping with the painting and was unaware that it was a violation. They stopped him after 1 bucket and directed him to the shop's floor drains. I double checked it was latex paint, which is permissable in the sewer system.
ESC13-01231 Random Inspection6/25/20146/25/20146/25/2014 12:43:17 PMPPASS
Boise Heights site is in decent condition. Perimeter wattle installed at base of security fence and all area DIs have filter bag protection. Permit posted at construction entrance.
ESC14-00463 Random Inspection6/25/20146/25/20146/25/2014 12:39:00 PMPPASS
Site has good construction entrance, all DI's protected, and permit posted. Security fence installed and wattles at southwest corner.
ESC13-00911 Aging Inspection6/25/20146/25/20146/25/2014 12:21:03 PM PASS
Additions is in prgress. Keeping sediment on site. No corrections required.
ESC13-00906 Aging Inspection6/25/20146/25/20146/25/2014 12:16:24 PM PART
WIP. Told employee on site to clean up the sediment in gutter in front of projects at end of day. He agreed to do so. Minor accumaltion.
ESC13-01071 Aging Inspection6/25/20146/25/20146/25/2014 12:07:35 PM PASS
Finaled.
ESC13-01071 DOC - Permit Finaled6/25/20146/25/20146/25/2014 12:07:26 PMPPASS
ESC conditions satisfied. BLD already finaled.
ESC13-00302 BMP Violation6/24/20146/25/20146/25/2014 12:01:13 PMACANC
check on conditions at this site
ESC14-00236 General Inspection6/25/20146/25/20146/25/2014 8:43:04 AM PASS