ESC14-00468
| Conference | 6/25/2014 | 6/25/2014 | 6/25/2014 3:59:39 PM | P | PASS |
|
|
RP-GC Gene returned call and said the street sidewalks and gutters on Skene and St. Patrick Street have been swept.
|
ESC13-00913
| Aging Inspection | 6/25/2014 | 6/25/2014 | 6/25/2014 1:56:17 PM | | PASS |
|
|
Finaled.
|
ESC13-00913
| DOC - Permit Finaled | 6/25/2014 | 6/25/2014 | 6/25/2014 1:55:56 PM | P | PASS |
|
|
Homeowner project is complete and all loose sediment stabilized. No trackout to Hill Road. BLD finaled. NO further ESC inspections required.
|
ESC14-00193
| General Inspection | 6/25/2014 | 6/25/2014 | 6/25/2014 1:43:29 PM | | PEND |
|
|
No activity yet for Old Boise sidewalk project. No site prep requested at this time.
|
ESC14-00192
| General Inspection | 6/25/2014 | 6/25/2014 | 6/25/2014 1:41:32 PM | | PEND |
|
|
No activity yet for Old Boise sidewalk project. No site prep requested at this time.
|
ESC14-00187
| General Inspection | 6/25/2014 | 6/25/2014 | 6/25/2014 1:41:13 PM | | PEND |
|
|
No activity yet for Old Boise sidewalk project. No site prep requested at this time.
|
ESC14-00154
| General Inspection | 6/25/2014 | 6/25/2014 | 6/25/2014 1:30:23 PM | | PASS |
|
|
No activity at time of inspection. Sidewalk and gutter are very clean, no sediment or trackout from site. The lot has been grubbed, but the wall is not yet installed.
|
ESC14-00468
| Random Inspection | 6/25/2014 | 6/25/2014 | 6/25/2014 1:15:13 PM | P | FAIL |
|
|
Foundation work is ongoing. Contractors getting dirt in street and covering sidewalk. Verbal request to employee to sweep up at end of day and also voicemail left on RP/GC Gene Harding's phone.
|
ESC13-00857
| Aging Inspection | 6/25/2014 | 6/25/2014 | 6/25/2014 1:01:09 PM | | PASS |
|
|
Finaled.
|
ESC13-00857
| DOC - Permit Finaled | 6/25/2014 | 6/25/2014 | 6/25/2014 1:00:51 PM | P | PASS |
|
|
House complete and landscaped. Active projects in area will address sediment across street. BLD permit finaled. ESC condtions met.
|
ESC14-00019
| Complaint Inspection | 6/25/2014 | 6/25/2014 | 6/25/2014 12:47:00 PM | P | PASS |
|
|
Complaint called in that painters were washing out buckets next to street.
Arrived at site and no paint have flowed to street or the storm drain at corner of La Pointe and Royal. Talked to painter and stated that washout must be contained and disposed of properly.
He stated the builder owners teenage son was helping with the painting and was unaware that it was a violation. They stopped him after 1 bucket and directed him to the shop's floor drains. I double checked it was latex paint, which is permissable in the sewer system.
|
ESC13-01231
| Random Inspection | 6/25/2014 | 6/25/2014 | 6/25/2014 12:43:17 PM | P | PASS |
|
|
Boise Heights site is in decent condition. Perimeter wattle installed at base of security fence and all area DIs have filter bag protection. Permit posted at construction entrance.
|
ESC14-00463
| Random Inspection | 6/25/2014 | 6/25/2014 | 6/25/2014 12:39:00 PM | P | PASS |
|
|
Site has good construction entrance, all DI's protected, and permit posted. Security fence installed and wattles at southwest corner.
|
ESC13-00911
| Aging Inspection | 6/25/2014 | 6/25/2014 | 6/25/2014 12:21:03 PM | | PASS |
|
|
Additions is in prgress. Keeping sediment on site. No corrections required.
|
ESC13-00906
| Aging Inspection | 6/25/2014 | 6/25/2014 | 6/25/2014 12:16:24 PM | | PART |
|
|
WIP. Told employee on site to clean up the sediment in gutter in front of projects at end of day. He agreed to do so. Minor accumaltion.
|
ESC13-01071
| Aging Inspection | 6/25/2014 | 6/25/2014 | 6/25/2014 12:07:35 PM | | PASS |
|
|
Finaled.
|
ESC13-01071
| DOC - Permit Finaled | 6/25/2014 | 6/25/2014 | 6/25/2014 12:07:26 PM | P | PASS |
|
|
ESC conditions satisfied. BLD already finaled.
|
ESC13-00302
| BMP Violation | 6/24/2014 | 6/25/2014 | 6/25/2014 12:01:13 PM | A | CANC |
|
|
check on conditions at this site
|
ESC14-00236
| General Inspection | 6/25/2014 | 6/25/2014 | 6/25/2014 8:43:04 AM | | PASS |
|
|
|