ELE15-01919
| Final | 6/25/2015 | 6/25/2015 | 6/25/2015 3:31:13 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by kendall bender final ok
|
ELE15-01919
| Electrical Rough-In | 6/25/2015 | 6/25/2015 | 6/25/2015 3:10:09 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by kendall bender r/i ok
|
ELE15-01138
| Electrical Rough-In | 6/24/2015 | 6/25/2015 | 6/25/2015 2:40:00 PM | P | PASS |
|
|
We are requesting a ceiling rough-in inspection for tomorrow 6/25/15 in the afternoon. Our contact is Bud @ ###-####. Thank you! Phone #: ###-#### Inspection requested via web by Clint Tate r/i ok t bar ceilings in rms 206 and 207
|
ELE15-01915
| Electrical Rough-In | 6/24/2015 | 6/25/2015 | 6/25/2015 2:14:08 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Richard Corn r/i ok new bathroom circuit to bathroom . Will need to look at floor heat after rough in of floor mat complete
|
ELE15-01473
| Rough-In Permanent Service | 6/25/2015 | 6/25/2015 | 6/25/2015 1:40:25 PM | P | PASS |
|
|
Mike Phone #: ###-#### r/i ok p/s o/h n ok
|
ELE15-01872
| Final | 6/24/2015 | 6/25/2015 | 6/25/2015 1:01:51 PM | P | PASS |
|
|
Please let me know when done so we can get IPCO to power up the service thanks Phone #: ###-#### Inspection requested via web by Thomas wilson FINAL OK
|
ELE15-01872
| Final | 6/24/2015 | 6/25/2015 | 6/25/2015 12:32:45 PM | P | CANC |
|
|
Please let me know when done so we can get IPCO to power up the service thanks Phone #: ###-#### Inspection requested via web by Thomas wilson double request
|
ELE14-03246
| Electrical Rough-In | 6/24/2015 | 6/25/2015 | 6/25/2015 12:16:41 PM | A | PASS |
|
|
Levi. Tower #4 Corridors 3rd ; 4th floors. Phone #: ###-#### Inspection requested via web by Sean DeLacy r/i ok
|
ELE15-01904
| Rough-In Permanent Service | 6/24/2015 | 6/25/2015 | 6/25/2015 11:01:44 AM | A | CANC |
|
|
Phone #: ###-#### Inspection requested via web by steve cooper needed r/i only
|
ELE15-01904
| Electrical Rough-In | 6/25/2015 | 6/25/2015 | 6/25/2015 10:57:18 AM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by steve cooper corrections made r/i ok
|
ELE15-00740
| Electrical Rough-In | 6/24/2015 | 6/25/2015 | 6/25/2015 10:46:54 AM | A | PASS |
|
|
Lonnie Sorichta Phone #: ###-#### Inspection requested via web by Kerri Hamilton r/i ok upst. office pony walls
|
ELE15-01908
| Electrical Rough-In | 6/24/2015 | 6/25/2015 | 6/25/2015 10:31:57 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Mark M r/i walls ok
|
ELE14-02195
| Final | 6/24/2015 | 6/25/2015 | 6/25/2015 10:14:03 AM | A | PASS |
|
|
This is a final inspection as per Rex. Please contact Kyle Little at ###-#### 30 minutes prior to arrival. Thank you and have a super day! Phone #: ###-#### Inspection requested via web by Laura Longshaw final ok services labeled
|
GCE15-00043
| GCE-Final | 6/24/2015 | 6/25/2015 | 6/25/2015 9:58:06 AM | A | PASS |
|
|
Bob ###-#### final ok
|
GCE15-00067
| GCE-Final | 6/24/2015 | 6/25/2015 | 6/25/2015 9:25:13 AM | A | PART |
|
|
Ben ###-#### corrections made. Temp. occupancy OK. Also r/i ok on 2 pole bases. waiting on light poles to show up to get final.
|
GCE15-00095
| GCE-Permanent Service | 6/23/2015 | 6/25/2015 | 6/25/2015 9:06:19 AM | A | PASS |
|
|
Contractor ###-#### met with Lewis and confirmed existing water bond for existing service. Existing service being altered on saturday to accomadate new 400 amp meter and main disconnect for T.I.. Power needs to be turned back on saturday for other tenants in building. Will look for available fault current label and ground rods on Monday 6-29-15. p/s u/g rec ok
|
ELE15-02131
| Electrical Rough-In | 6/25/2015 | 6/25/2015 | 6/25/2015 12:00:00 AM | A | PASS |
|
|
4th floor drops, 5th floor shafts. Phone #: ###-#### Inspection requested via web by Rafael Castillo r/i ok drop ceilings in rms. 432 thru 434, 436, 437, 439, 427 thru 429. Also vent. shafts in 5th flr see E3.2 sheet
|
GCE15-00095
| GCE-Rough-In | 6/22/2015 | 6/25/2015 | 6/24/2015 12:00:00 AM | A | CANC |
|
|
Contractor ###-####
|