ESC15-00006
| General Inspection | 6/25/2015 | 6/25/2015 | 6/25/2015 4:43:55 PM | P | PASS |
|
|
WIP. Frame is up, though exterior shell still under construction. No trackout to street, trash and materials are contained; permit sign posted with contact details on security fencing which surrounds the project. Approved.
|
ESC15-00024
| General Inspection | 6/24/2015 | 6/25/2015 | 6/25/2015 4:06:27 PM | A | PART |
|
|
WIP. No discharges or hillside rills/gullys on or around foothills SFH project.
Correction needed: sweep up loose sediment and dirt on the sidewalk and gutter in front of house.
Verbal correction request given to Westminster RP
|
ESC14-00932
| Site Final | 6/25/2015 | 6/25/2015 | 6/25/2015 3:11:57 PM | P | PASS |
|
|
Parking lot and site improvement project is complete. Area between project and Gowen Road has been stabilized with tacifier and mulch. Wattles will remain on site till full revegetation. No further ESC inspections needed, site in very good condition.
|
ESC14-00526
| Site Final | 6/25/2015 | 6/25/2015 | 6/25/2015 2:36:26 PM | P | PART |
|
|
(This activity was added in error so we have changed the case status back to Issued.)
Project complete. No loose dirt or disturbed area. Need to remove DI bag that was installed in front of site. Notified Syman Co. who was contracted for SWPPP.
|
ESC13-00213
| General Inspection | 6/25/2015 | 6/25/2015 | 6/25/2015 2:19:43 PM | | PASS |
|
|
|
ESC14-00788
| Random Inspection | 6/25/2015 | 6/25/2015 | 6/25/2015 2:07:37 PM | P | PASS |
|
|
No activity at time of inpection. Warm Springs along project frontage does not have significant amounts of trackout or loose sediment. No runoff or discharges from site. No fugitive dust observed.
Roads and gutters have been completed, the entranceway is in progress with installation of Pavedrain permeable pavers has been staged &prepped but not yet installed. RP Lance informed me that the bricks are defective and either a new shipment is coming or will find alternative product.
|
ESC15-00094
| General Inspection | 6/19/2015 | 6/25/2015 | 6/25/2015 1:35:18 PM | A | PASS |
|
|
Follow inspection from corrections issued 6/19
Entrance has been swept as requested. No activity. No dust or other issues observed. Approved.
|
ESC13-00230
| General Inspection | 6/25/2015 | 6/25/2015 | 6/25/2015 12:02:15 PM | | PASS |
|
|
|
ESC14-00962
| Site Final | 6/25/2015 | 6/25/2015 | 6/25/2015 11:13:48 AM | P | PASS |
|
|
Landscaping and stabilization at renovated Station 17 is complete and sidewalks and gutters have been swept. BLD finaled on TO. No ESC issues that need correcting. ESC permit finaled.
|
ESC15-00043
| Aging Inspection | 6/25/2015 | 6/25/2015 | 6/25/2015 11:01:18 AM | | PASS |
|
|
SFH near completion. Frame is up and exterior painted. Needs landscaping and final site cleanup. No trackout or sediment runoff occuring.
|
ESC14-00418
| General Inspection | 6/25/2015 | 6/25/2015 | 6/25/2015 10:50:21 AM | | PASS |
|
|
Construction and landscaping complete. Temporary perimeter BMPs removed after revegetation/stabilization of hillsides.
ESC permit conditions satisfied. All other permits finaled.
|
ESC14-00418
| DOC - Permit Finaled | 6/25/2015 | 6/25/2015 | 6/25/2015 10:48:12 AM | P | PASS |
|
|
|
ESC15-00623
| General Inspection | 6/25/2015 | 6/25/2015 | 6/25/2015 10:31:28 AM | A | PASS |
|
|
ESC permit sign posted. Perimeter gator guard wattle installed and working effectively. Some minor trackout on sidewalk can be swept this week during housekeeping..
No sediment leaving site. Approved.
|
ESC14-00273
| General Inspection | 6/25/2015 | 6/25/2015 | 6/25/2015 10:27:19 AM | | PASS |
|
|
Landscaping and stabilization complete. Temp BMPs removed and perimeter areas of yard have had tacifier and seed applied. ESC permit conditions satisfied.
|
ESC14-00273
| DOC - Permit Finaled | 6/25/2015 | 6/25/2015 | 6/25/2015 10:26:29 AM | P | PASS |
|
|
|
ESC15-00541
| General Inspection | 6/25/2015 | 6/25/2015 | 6/25/2015 10:22:23 AM | A | PASS |
|
|
Grading complete, no vertical construction has occurred. Does not look like utilities have been stubbed in yet. Some sand has been added to lower terraces and the terraces have been track perpendicular to the slopes properly. No issues at site.
|
ESC13-01167
| General Inspection | 6/25/2015 | 6/25/2015 | 6/25/2015 9:57:41 AM | | PASS |
|
|
Revegetation in progress as noted previous inspection. No rills or issues observed on the slope. Approved.
|
ESC11-00192
| General Inspection | 6/25/2015 | 6/25/2015 | 6/25/2015 9:56:02 AM | | PASS |
|
|
No hillside erosion, fugitive dust, or discharges observed from active projects. Open areas have revegetated well or are compacted dirt/sand.
|
ESC13-00193
| General Inspection | 6/25/2015 | 6/25/2015 | 6/25/2015 9:38:41 AM | | PASS |
|
|
No activity at site. Perimeter BMPs (silt fence and wattles) are installed with no significant breaches. Culdesac is free of loose sediment. Inlet bag has been recently emptied and reinstalled. No corrections necessary at this time.
|
ESC15-00052
| Aging Inspection | 6/25/2015 | 6/25/2015 | 6/25/2015 9:06:21 AM | | PASS |
|
|
Sidewalk project complete. No ESC issues at site, permit closed.
|
ESC15-00052
| DOC - Permit Finaled | 6/25/2015 | 6/25/2015 | 6/25/2015 9:05:43 AM | P | PASS |
|
|
|