ELE18-02357
| Conference | 6/25/2018 | 6/25/2018 | 6/25/2018 4:10:21 PM | P | DONE |
|
|
Corka--please call 20 mins before Phone #: ###-#### Discussed service change to 200 amps. Shall provide 3' from operable windows, size of service entrance conductors, grounding electrode system to include metal underground water pipe if water main is still metal. Owner felt addition of breakers equalled 390 amps of power being used. Informed how service calculations are done and encouraged to test amperage under heavy load to see what actual draw is.
|
ELE18-00776
| Final | 6/22/2018 | 6/25/2018 | 6/25/2018 3:14:06 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by JENNY EMEL All receptacles in break area are GFCI protected, 4- 2 pole receptacles in lab not required to be GFCI protected due to not being used as a kitchen and not located with in 6' of a sink. Final ok
|
ELE17-01337
| Final | 6/25/2018 | 6/25/2018 | 6/25/2018 3:13:55 PM | P | PART |
|
|
Guest rooms on floor 1 not ready, Laundry equipment not wired but in place wiring blanked off, level 1 west baths vanities blanked off, Floor receptacles thru out level 1 blanked off. Signed TCO phase 1 only. Phase 1 and guest rooms levels 2 thru 5 TCO ok
|
ELE18-01457
| Final | 6/25/2018 | 6/25/2018 | 6/25/2018 2:10:52 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Brad Girard No card posted. Final ok
|
ELE18-02334
| Final | 6/25/2018 | 6/25/2018 | 6/25/2018 2:09:56 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Brad Girard Final ok
|
ELE18-02334
| Electrical Rough-In | 6/25/2018 | 6/25/2018 | 6/25/2018 2:09:56 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Brad Girard Grid rough in ok cover
|
ELE18-02283
| Final | 6/22/2018 | 6/25/2018 | 6/25/2018 1:01:59 PM | A | FAIL |
|
|
Contact name is Bill Canfield Phone #: ###-#### Inspection requested via web by Tyler Ridley 210.63 Heating, Air-Conditioning, and Refrigeration Equipment Outlet. A 125-volt, single-phase, 15- or 20-ampere-rated receptacle outlet shall be installed at an accessible location for the servicing of heating, air-conditioning, and refrigeration equipment. The receptacle shall be located on the same level and within 7.5 m (25 ft) of the heating, air-conditioning, and refrigeration equipment. The receptacle outlet shall not be connected to the load side of the equipment disconnecting means.
|
ELE17-04065
| Electrical Rough-In | 6/22/2018 | 6/25/2018 | 6/25/2018 10:26:02 AM | A | PASS |
|
|
Ceiling cover. Danny is the contact Phone #: ###-#### Inspection requested via web by Buster Bowen Basement grid rough in ok cover
|
ELE18-02360
| Conference | 6/22/2018 | 6/25/2018 | 6/25/2018 9:42:43 AM | A | DONE |
|
|
Please call ahead for access - David Phone #: ###-#### Discussed moving 3-way switch near entrance to house from garage. Done at time of conference. Also adding receptacle in garage on north wall. OK to come off existing circuit and installing a tamper resistant GFCI protected receptacle. Gave copy of most frequently asked questions. Will call for rough in inspection when ready.
|
ELE18-01353
| Final | 6/22/2018 | 6/25/2018 | 6/25/2018 9:17:31 AM | A | FAIL |
|
|
Garage code is 1280 Phone #: ###-#### Inspection requested via web by TOM BICANDI 210.52- Each residence shall have a receptacle outlet installed at front and rear of house. Front receptacle not installed. 314.20- Boxes installed in a combustible material shall be flush with surface or have an extension ring installed. Master bath vanity in cabinets at left and right.
|
ELE18-02338
| Electrical Rough-In | 6/21/2018 | 6/25/2018 | 6/25/2018 8:45:44 AM | A | PASS |
|
|
garage access code 1001e Phone #: ###-#### Inspection requested via web by Alan Lusk Rough in ok cover
|
ELE18-02338
| Permanent Service | 6/25/2018 | 6/25/2018 | 6/25/2018 8:45:35 AM | P | PASS |
|
|
garage access code 1001e Phone #: ###-#### Inspection requested via web by Alan Lusk p/s u/g n ok
|