ELE18-02359
| Electrical Rough-In | 6/22/2018 | 6/25/2018 | 6/25/2018 2:44:42 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by David Green...laundry wiring changed to stackable unit, outlets added, and fireplace with outlet above..ok to cover
|
ELE18-02348
| Electrical Rough-In | 6/25/2018 | 6/25/2018 | 6/25/2018 2:29:38 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by kendall bender....south wall cover ok for party rooms
|
ELE18-02304
| Final | 6/19/2018 | 6/25/2018 | 6/25/2018 1:59:27 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Matthew White...circuit for attic fan and 20A 240V outlet for future A/C unit...job complete...ok to final
|
ELE18-01795
| Final | 6/25/2018 | 6/25/2018 | 6/25/2018 1:16:06 PM | P | PASS |
|
|
Call John with 1/2 hour notice. ###-####. Phone #: ###-#### Inspection requested via web by Barbara Szurgot...labelling, disconnect,and OCPD ok to final
|
ELE18-02362
| Electrical Rough-In | 6/22/2018 | 6/25/2018 | 6/25/2018 11:11:47 AM | A | PASS |
|
|
Rough-in wall inspection. Phone #: ###-#### Inspection requested via web by Cathy Duchek...ok to cover exterior walls of clean rm ...m/c material used to wire prefabed walls of clean room to cut in boxes
|
ELE18-02315
| Conference | 6/20/2018 | 6/25/2018 | 6/25/2018 10:50:05 AM | A | PASS |
|
|
Sid Phone #: ###-####...wiring lighting for new covered patio...homeowner competent in work
|
ELE18-02315
| Electrical Rough-In | 6/25/2018 | 6/25/2018 | 6/25/2018 10:48:51 AM | A | PASS |
|
|
Sid Phone #: ###-####...rough in for back patio...ok to cover
|
ELE18-00834
| Final | 6/22/2018 | 6/25/2018 | 6/25/2018 10:14:39 AM | A | FAIL |
|
|
Phone #: ###-#### Inspection requested via web by Todd Hall...
1.. micro outlets need installed completely...all units
2..kitchen GFCI will not reset...unit # 105
3...access to riser room needed...door locked
|
ELE18-00529
| Final | 6/22/2018 | 6/25/2018 | 6/25/2018 10:11:15 AM | A | FAIL |
|
|
Phone #: ###-#### Inspection requested via web by Todd Hall... 1..house panel shall be completely labelled 2..fire alarm circuit shall be marked red and breaker lockout applied
|
ELE18-01468
| Final | 6/22/2018 | 6/25/2018 | 6/25/2018 9:02:05 AM | A | PASS |
|
|
access 2758 Phone #: ###-#### Inspection requested via web by David Nelson...corrections made...ok to final
|
ELE18-02225
| Temporary Service | 6/22/2018 | 6/25/2018 | 6/25/2018 8:18:09 AM | A | PASS |
|
|
Steve Hook is contact. ###-####. Good to final out also. Phone #: ###-#### Inspection requested via web by Debby Pierce...t/s u/g new ok
|