BLD17-03648
| BLD-Framing/Rough-in | 6/22/2018 | 6/25/2018 | 6/26/2018 8:24:20 AM | A | PASS |
|
|
Jose Phone #: ###-####. Exterior steel stud columns ok.
|
BLD18-01450
| BLD-Footing | 6/22/2018 | 6/25/2018 | 6/25/2018 4:04:31 PM | P | PART |
|
|
Dane Phone #: ###-####
|
BLD18-01173
| BLD-Footing | 6/22/2018 | 6/25/2018 | 6/25/2018 4:04:19 PM | P | PART |
|
|
Dane Phone #: ###-####
|
BLD18-01451
| BLD-Footing | 6/22/2018 | 6/25/2018 | 6/25/2018 4:04:04 PM | P | PART |
|
|
Dane Phone #: ###-####
|
BLD18-02240
| BLD-Final | 6/24/2018 | 6/25/2018 | 6/25/2018 3:33:33 PM | P | DONE |
|
|
Phone #: ###-#### Inspection requested via web by mark bedard
|
BLD18-02240
| DOC - Permit Finaled | 6/25/2018 | 6/25/2018 | 6/25/2018 3:33:26 PM | P | PASS |
|
|
|
BLD18-02240
| DOC - Permit Finaled | 6/25/2018 | 6/25/2018 | 6/25/2018 3:32:32 PM | P | PASS |
|
|
|
BLD17-02419
| BLD-Final | 6/25/2018 | 6/25/2018 | 6/25/2018 3:09:21 PM | P | NR |
|
|
Fire Final called in for PM as well. Phone #: ###-#### Inspection requested via web by David Scaggs. Needs fire/life/safety fialfirst.
|
BLD16-02553
| BLD-Final | 6/25/2018 | 6/25/2018 | 6/25/2018 3:08:58 PM | P | DONE |
|
|
Final Phone #: ###-#### Inspection requested via web by Joshua Adams
|
BLD16-02553
| DOC - Permit Finaled | 6/25/2018 | 6/25/2018 | 6/25/2018 3:08:47 PM | P | PASS |
|
|
All work appeares to be done in accordance with local codes and orrdinances.
|
BLD18-01499
| BLD-Footing | 6/25/2018 | 6/25/2018 | 6/25/2018 3:01:59 PM | P | NR |
|
|
Doug Phone #: ###-####-please call to meet
|
BLD16-03410
| BLD-Final | 6/25/2018 | 6/25/2018 | 6/25/2018 2:44:17 PM | P | DONE |
|
|
Final Phone #: ###-#### Inspection requested via web by Joshua Adams
|
BLD16-03410
| DOC - Permit Finaled | 6/25/2018 | 6/25/2018 | 6/25/2018 2:44:05 PM | P | PASS |
|
|
Wrok appeares to be done in accordance with local codes and ordinances.
|
BLD16-04490
| BLD-Framing/Rough-in | 6/25/2018 | 6/25/2018 | 6/25/2018 2:43:14 PM | P | FAIL |
|
|
Phone #: ###-#### Inspection requested via web by Sam Brown. Complete lateral bracing on A03 truss. Fire wall does not extend to exterior wall. LVL to extend to pick up floor joist above stairs. Ok to insulate. Correction notice posted.
|
BLD16-04489
| BLD-Framing/Rough-in | 6/25/2018 | 6/25/2018 | 6/25/2018 2:41:50 PM | P | FAIL |
|
|
Phone #: ###-#### Inspection requested via web by Sam Brown. Need safety glazing at window by tub upstairs, studs on east wall at mid landing cut short, no bearing on bottom. Correction notice posted. Ok to insulate.
|
BLD17-04138
| BLD-Final | 6/25/2018 | 6/25/2018 | 6/25/2018 1:50:52 PM | P | PASS |
|
|
Robert Phone #: ###-####
|
BLD17-04138
| DOC - Permit Finaled | 6/25/2018 | 6/25/2018 | 6/25/2018 1:50:45 PM | P | PASS |
|
|
|
BLD17-03367
| BLD-Framing/Rough-in | 6/25/2018 | 6/25/2018 | 6/25/2018 1:28:13 PM | P | PASS |
|
|
Sid Phone #: ###-####
|
BLD17-00959
| BLD-Final | 6/22/2018 | 6/25/2018 | 6/25/2018 11:26:44 AM | A | PASS |
|
|
Cecil Phone #: ###-####. OK for perm oc.
|
BLD18-02055
| BLD-Final | 6/24/2018 | 6/25/2018 | 6/25/2018 9:57:06 AM | A | DONE |
|
|
need final Phone #: ###-#### Inspection requested via web by Chris Howell
|
BLD18-02055
| DOC - Permit Finaled | 6/25/2018 | 6/25/2018 | 6/25/2018 9:56:51 AM | P | PASS |
|
|
All work appeared to be done in accordance with local codes and ordinances.
|
BLD18-01499
| Extend Permit 90/180 days | 6/21/2018 | 6/25/2018 | 6/25/2018 9:45:38 AM | A | FAIL |
|
|
Rick Phone #: ###-####. Several areas were rebar is on ground and less than 3 inches of clearance. Verts to be tied in place prior to placing concrete. Correction notice posted.
|
BLD18-01465
| BLD-Wall cover | 6/22/2018 | 6/25/2018 | 6/25/2018 9:25:27 AM | A | FAIL |
|
|
Phone #: ###-#### Inspection requested via web by Andy Thompson. Provide the portal frame at arched window as shown on approved plans, complete 2nd. floor.
|
BLD18-01001
| BLD-Framing/Rough-in | 6/22/2018 | 6/25/2018 | 6/25/2018 8:57:52 AM | A | FAIL |
|
|
Ben Phone #: ###-####. Install blocking at panel edges at corners of structure for 4ft. ither direction and fasten as shown on the approved plans. Correction notice issued.
|
BLD18-01046
| BLD-Final | 6/19/2018 | 6/25/2018 | 6/25/2018 8:40:33 AM | A | DONE |
|
|
Phone #: ###-#### Inspection requested via web by Steve VanWinkle
|
BLD18-01046
| DOC - Permit Finaled | 6/25/2018 | 6/25/2018 | 6/25/2018 8:40:24 AM | P | PASS |
|
|
|
BLD18-01259
| BLD-Final | 6/19/2018 | 6/25/2018 | 6/25/2018 8:40:16 AM | A | DONE |
|
|
Phone #: ###-#### Inspection requested via web by Steve VanWinkle
|
BLD18-01259
| DOC - Permit Finaled | 6/25/2018 | 6/25/2018 | 6/25/2018 8:40:06 AM | P | PASS |
|
|
|
BLD18-02148
| BLD-Framing/Rough-in | 6/25/2018 | 6/25/2018 | 6/25/2018 8:39:54 AM | A | PART |
|
|
work in progress. Section were roof joist has been damaged not yet removed, mech units still in place. Also another section has has been identified were roof joist will ned to be replaced. Area inspected missing fasteners in roof decking. areas were marked.
|
BLD18-00823
| BLD-Footing | 6/22/2018 | 6/25/2018 | 6/25/2018 8:04:51 AM | A | NR |
|
|
Brice Phone #: ###-####. Needs subgrade inspection from geotech and submit report. No inspection.
|