Inspections for the day of: Monday, June 25, 2018.
Number of inspections: 18
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorJim Page
TitleFIRE INSPECTOR
Phone #208-914-5431
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR18-00052 INSP-Final Inspection6/25/20186/25/20186/26/2018 8:15:15 AMPCANC
Kc Strykowski - Tech Phone #: ###-#### Inspection requested via web by John Siewert
BLD17-02419 FIRE-Final Inspection6/25/20186/25/20186/25/2018 3:52:28 PMPFAIL
Only 1 smoke detector in the unit 102 would sound when test buttons was pushed, smoke detectors in the units all need to sound when smoke detection audible is activated.

Phone #: ###-#### Inspection requested via web by David Scaggs
BLD17-02413 FIRE-Final Inspection6/25/20186/25/20186/25/2018 3:38:10 PMPPASS
Fire sprinkler inspection complete, fire alarm inspection complete, fire extinguishers are mounted under kitchen cabinets, knox box is located on the north side of building next to FDC. Final life fire safety i nspection complete.

Phone #: ###-#### Inspection requested via web by David Scaggs
FIR17-00267 INSP-Final Inspection6/22/20186/25/20186/25/2018 3:11:37 PMPPASS
Final fire sprinkler inspection complete.

Contact Ken Orahood - 28-###-#### 30 min prior to Final Insp start please.

Thank YOU Phone #: ###-#### Inspection requested via web by Teri Cruickshank
FIR17-00471 INSP-Final Inspection6/22/20186/25/20186/25/2018 3:10:57 PMPFAIL
Sounder bases in rooms would not stay in alarm during general alarm, sounder bases need to keep sounding during general alarm.

Travis Phone #: ###-####
FIR18-00327 INSP-Sprinkler Rough-in6/25/20186/25/20186/25/2018 1:51:15 PMPPASS
New over-build on the southeast side of building has been filled with insulation, no fire sprinkler upright protection required in area filled with insualtion.

Please call Todd 30 minutes prior to arrival Phone #: ###-#### Inspection requested via web by Sam Ball
NAF16-00069 INSP-Sprinkler Rough-in/Hydro6/25/20186/25/20186/25/2018 1:31:01 PMPCANC
Call prior to going Phone #: 2087133422 >> Inspection requested via mobile web by Tim Opp Inspection cancelled via mobile web on Monday, June 25, 2018.
FIR18-00437 INSP-Final Inspection6/22/20186/25/20186/25/2018 11:08:20 AMAPASS
Final fire sprinkler inspection for area of work complete,

Payton Phone #: ###-####
NAF18-00061 INSP-Sprinkler Rough-in6/22/20186/25/20186/25/2018 10:38:57 AMAFAIL
Tenting not installed at time of inspetion, tenitng will need to be completed and inspected before overhead fire sprinkler piping can be covered, no cover is approved.

tenting inspection Phone #: ###-#### Inspection requested via web by Matthew Lewis
FIR18-00487 INSP-Sprinkler Rough-in6/25/20186/25/20186/25/2018 10:19:44 AMAPASS
Wrong inspection request was scheduled on 22JUNE2018, inspection should have been a rough in inspection and not a final, permit status has been corrected, notes for rough in inspection are as followed: Rough to cover inspection overhead fire sprinkler piping in area of work complete, approved for cover. Reliable fusible link heads with the 401 escutcheons will need to be changed to quick response heads before final inspection, head change will be verified at final inspection.
FIR17-00286 INSP-Final Inspection6/22/20186/25/20186/25/2018 10:07:09 AMAPASS
Final fire sprinkler inspection for area of work complete.

don forester Phone #: ###-#### Inspection requested via web by Brodie Stenquist
BLD18-00028 FIRE-Final Inspection6/24/20186/25/20186/25/2018 9:37:12 AMAPASS
Fire sprinkler inspection is complete, fire alarm inspection is complete, fire extinguisher is in place with a current inspection tag, thumbturn deadbolts on south exit doors to be replaced with blanks before final BLD inspection, addressing will be installed when cracked front window is replaced. Final life fire safety inspection complete.

To coincide with alarm and sprinkler finals, as per their permit inspections. Phone #: ###-#### Inspection requested via web by Ryan Wilhelm
FIR18-00212 INSP-Final Inspection6/22/20186/25/20186/25/2018 9:33:54 AMAPASS
Final fire alarm inspection for area of work complete.

Contact is Dirk. Phone #: ###-#### Inspection requested via web by Morgan Ahten
FIR18-00299 INSP-Final Inspection6/25/20186/25/20186/25/2018 9:33:24 AMAPASS
Final fire sprinkler inspection for area of work complete.
BLD18-00736 FIRE-Final Inspection6/25/20186/25/20186/25/2018 8:43:04 AMAPASS
Fire sprinkler inspection complete, fire alarm inspection complete, fire extinguishers are in place with current inspection tags. Final life fire safety inspection for area of work complete.
FIR18-00316 INSP-Final Inspection6/22/20186/25/20186/25/2018 8:35:45 AMAPASS
Final fire sprinkler inspection for area of work complete.

Phone #: ###-#### Inspection requested via web by Sam Ball
FIR18-00421 INSP-Final Inspection6/22/20186/25/20186/25/2018 8:34:45 AMAPASS
Final fire alarm nispection for area of work complete.

We would like to do the inspection at 7:00 am if possible. Phone #: ###-#### Inspection requested via web by Sam Ball
NAF16-00066 INSP-Final6/25/20186/25/20186/25/2018 12:00:00 AMPPASS
Verified that addess has been up dated with the fire department. Ron Johnson verified that he has recieved the update. 6-25-18**ajs**>> Inspection requested via mobile web by ParkwayCall prior to going Phone #: 2087133422 >> Inspection requested via mobile web by Tim opp