ELE20-02137
| Conference | 6/24/2020 | 6/25/2020 | 6/25/2020 2:17:13 PM | P | DONE |
|
|
Phone #: ###-#### Inspection requested via web by greg spohn Discussed required outlets in garage, exterior outlets, lights, service recept for mini split and TR/WR
|
ELE20-01168
| Final | 6/24/2020 | 6/25/2020 | 6/25/2020 1:38:18 PM | A | PASS |
|
|
**screened** Steve, please call ahead for access Phone #: ###-#### Ok final. 2 floor outlets are blanked off, not being used.
|
ELE20-02168
| Rough-In Permanent Service | 6/25/2020 | 6/25/2020 | 6/25/2020 1:22:46 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Kevin Heideman Ok cover. p/s u/g n ok
|
ELE20-01756
| Conference | 6/24/2020 | 6/25/2020 | 6/25/2020 12:57:09 PM | P | DONE |
|
|
Hi, I have recently been in contact with a designer at Idaho Power about my current plan and they are in agreement. I was originally thinking of changing from overhead to underground service but I now plan on adding a new service to my garage and possibly feeding it to my house at a later date. Phone #: ###-#### Inspection requested via web by Steve Krag Discussed install of new 200a feed through on detached garage. # of rods required, drop height over alley, guy kit
|
ELE20-02053
| Permanent Service | 6/24/2020 | 6/25/2020 | 6/25/2020 12:56:07 PM | P | PASS |
|
|
Service change on remodel project. Contact is HP. Thank you Phone #: ###-#### Inspection requested via web by Steve Blackmer p/s o/h n ok
|
ELE20-02112
| Electrical Rough-In | 6/25/2020 | 6/25/2020 | 6/25/2020 11:49:21 AM | P | PASS |
|
|
Underground Trench for future solar on shed Phone #: ###-#### Inspection requested via web by Jesse Simpson Ok cover grd work. Trench at 24"
|
ELE20-02068
| Final | 6/24/2020 | 6/25/2020 | 6/25/2020 11:27:57 AM | P | PASS |
|
|
Please call Aric on your way - ###-#### Phone #: ###-#### Inspection requested via web by Arielle Hendricks Ok final. 20a brkr on 25a max fuse.
|
ELE20-01922
| Final | 6/24/2020 | 6/25/2020 | 6/25/2020 10:32:43 AM | A | PASS |
|
|
Contact electrician Josh Slater with any questions. Thank you, Phone #: ###-#### Inspection requested via web by Cathy Duchek Ok final
|
ELE20-02162
| Electrical Rough-In | 6/25/2020 | 6/25/2020 | 6/25/2020 10:01:28 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Dave Brueggemann Ok cover Riser room
|
ELE20-02154
| Temporary Service | 6/24/2020 | 6/25/2020 | 6/25/2020 9:37:24 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Bonnie Page t/s o/h n ok
|
ELE20-01372
| Electrical Rough-In | 6/24/2020 | 6/25/2020 | 6/25/2020 9:16:53 AM | A | PASS |
|
|
Underground inspection. Call Chase Wangen if questions - ###-#### Phone #: ###-#### Inspection requested via web by Shane Dale Ok cover grd work for 4 precast pole bases on W side.
|
ELE20-00206
| Final | 6/24/2020 | 6/25/2020 | 6/25/2020 5:11:23 AM | A | CANC |
|
|
Rescheduled from 6/24 Talked to contractor, breaker wont be in until friday
|