BLD01-00570
| BLD-Aging Inspection | 6/26/2001 | 6/26/2001 | 6/26/2001 12:00:00 AM | | PART |
|
|
Called..... work in progress. 6/26/2001 7:54:01 AM
|
BLD01-00832
| BLD-Framing/Rough-in | 6/25/2001 | 6/26/2001 | 6/26/2001 12:00:00 AM | A | FAIL |
|
|
###-#### todd C/N posted. 6/26/2001 11:35:12 AM
|
BLD01-01247
| BLD-Framing/Rough-in | 6/25/2001 | 6/26/2001 | 6/26/2001 12:00:00 AM | A | PASS |
|
|
and shear panel Cheuck ###-####
|
BLD00-02841
| BLD-Wall cover | 6/25/2001 | 6/26/2001 | 6/26/2001 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 06/25/2001 at 16:39:09. Contact: ###-####. Shear OK.... 6/26/2001 10:47:11 AM
|
BLD01-01499
| BLD-Foundation | 6/26/2001 | 6/26/2001 | 6/26/2001 12:00:00 AM | P | PASS |
|
|
Dane ###-####
|
BLD01-01516
| BLD-Foundation | 6/26/2001 | 6/26/2001 | 6/26/2001 12:00:00 AM | P | PASS |
|
|
robert baker ###-####
|
BLD01-01266
| BLD-Footing | 6/26/2001 | 6/26/2001 | 6/26/2001 12:00:00 AM | P | CANC |
|
|
Robert Baker ###-#### NR 6/26/2001 1:15:37 PM
|
BLD01-01524
| BLD-Foundation | 6/26/2001 | 6/26/2001 | 6/26/2001 12:00:00 AM | P | PART |
|
|
Cal ###-#### Bsmnt wall 6/26/2001 3:04:09 PM
|
BLD01-01175
| BLD-Final | 6/26/2001 | 6/26/2001 | 6/26/2001 12:00:00 AM | P | FAIL |
|
|
###-#### Need Req signatures. 6/26/2001 5:23:09 PM
|