ELE02-01915
| Electrical Rough-In | 6/25/2002 | 6/26/2002 | 6/26/2002 12:00:00 AM | A | FAIL |
|
|
r/i- please call 1st before insp/###-#### marv
met with contractor correction posted 300.10 shall install bond bushings where conduits enter non metallic boxes and R E washers are used 314.15 shall install hubs, sealing locknut, or washers for wet location(car wash) 6/26/2002 11:08:59 AM
|
ELE02-00523
| Rough-In Permanent Service | 6/25/2002 | 6/26/2002 | 6/26/2002 12:00:00 AM | A | PASS |
|
|
###-#### MIKE r/i in garage and house ok needs clearence for sub panel in basement
p/s o/h rec ok 6/26/2002 12:00:07 PM
|
ELE02-01925
| Temporary Service | 6/25/2002 | 6/26/2002 | 6/26/2002 12:00:00 AM | A | PASS |
|
|
repuested by jack.
t/s u/g new ok 6/25/2002 6:30:15 PM
|
ELE02-01938
| Temporary Service | 6/25/2002 | 6/26/2002 | 6/26/2002 12:00:00 AM | A | FAIL |
|
|
karen ###-#### called needs 220 volt gfci breaker 6/26/2002 1:51:43 PM
|
ELE01-04209
| Final | 6/25/2002 | 6/26/2002 | 6/26/2002 12:00:00 AM | A | PART |
|
|
JOCK ###-#### partial only owner still has a few things to do for complete final 6/26/2002 3:03:11 PM
|
ELE02-01932
| Electrical Rough-In | 6/25/2002 | 6/26/2002 | 6/26/2002 12:00:00 AM | A | NH |
|
|
Scheduled by a contractor via Hello! on 06/25/2002 at 15:30:26. Contact: ###-####. called no access all corrections not made 6/26/2002 10:40:06 AM
|
ELE02-01431
| Final | 6/25/2002 | 6/26/2002 | 6/26/2002 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 06/25/2002 at 22:53:56. Contact: ###-####. ok 6/26/2002 10:17:02 AM
|
ELE02-01290
| Electrical Rough-In | 6/26/2002 | 6/26/2002 | 6/26/2002 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 06/26/2002 at 07:17:46. Contact: ###-####. ok 6/26/2002 12:31:23 PM
|
ELE02-01940
| Rough-In Permanent Service | 6/26/2002 | 6/26/2002 | 6/26/2002 12:00:00 AM | P | PART |
|
|
JOHN ###-#### PLEASE CALL JOHN AS THIS IS IN ST ALS SOUTH TOWER... conference only ok 6/26/2002 5:07:27 PM
|
ELE02-01832
| Electrical Rough-In | 6/26/2002 | 6/26/2002 | 6/26/2002 12:00:00 AM | P | FAIL |
|
|
call 1st before insp- nolan- ###-#### cell
cor. posted met contractor at job site not ready, and 314.20 boxes set back more than 1/4 inch from combustible finished surface 6/26/2002 3:39:57 PM
|
ELE02-01796
| Final | 6/26/2002 | 6/26/2002 | 6/26/2002 12:00:00 AM | P | PASS |
|
|
fn - miller elec-###-#### ok 6/26/2002 5:23:33 PM
|
ELE02-01950
| Electrical Rough-In | 6/26/2002 | 6/26/2002 | 6/26/2002 12:00:00 AM | P | PART |
|
|
John ###-#### u/g and floor boxes only no walls 6/26/2002 3:54:20 PM
|
ELE02-01405
| Final | 6/25/2002 | 6/26/2002 | 6/26/2002 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 06/25/2002 at 15:11:28. Contact: ###-####. ok
6/26/2002 5:51:01 PM
|
ELE02-01802
| Permanent Service | 6/14/2002 | 6/26/2002 | 6/26/2002 12:00:00 AM | P | CANC |
|
|
dale ###-####--cancel per jeff
|