Inspections for the day of: Wednesday, June 26, 2002.
Number of inspections: 13
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorCarl Dependahl
TitleBLD-COM/RES INSPECTOR
Phone #794-9492
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD01-00234 BLD-Conference6/25/20026/26/20026/26/2002 12:00:00 AMAPASS
Wendell ###-#### w/ Rick j...re final status 6/26/2002 4:12:39 PM
BLD02-01219 BLD-Energy code compliance6/25/20026/26/20026/26/2002 12:00:00 AMANR
Scheduled by a contractor via Hello! on 06/25/2002 at 16:57:37. Contact: ###-####.
BLD02-01219 BLD-Framing/Rough-in6/25/20026/26/20026/26/2002 12:00:00 AMAFAIL
Scheduled by a contractor via Hello! on 06/25/2002 at 16:58:37. Contact: ###-####. keep c/n 6/26/2002 12:23:05 PM
BLD02-00845 BLD-Final6/26/20026/26/20026/26/2002 12:00:00 AMPNR
SHAWN ###-####...need plans, smoke dets 6/26/2002 3:21:45 PM
BLD02-01196 BLD-Framing/Rough-in6/26/20026/26/20026/26/2002 12:00:00 AMPFAIL
SHEER WALL ###-#### TODD nr , add nails per plan or show staple s as ok by eng'r 6/26/2002 11:46:22 PM
BLD02-01194 BLD-Framing/Rough-in6/26/20026/26/20026/26/2002 12:00:00 AMPFAIL
SHEER WALL ###-#### TODD keep c/n, add blocks, nails per plans 6/26/2002 11:45:16 PM
BLD02-00731 BLD-Conference6/26/20026/26/20026/26/2002 12:00:00 AMPPASS
###-#### SAM ADA clr at rest rm.ok due to existing stand pipe ( 19" to c.l.) Awaiting archs detail re corridor walls 6/26/2002 2:33:10 PM
BLD98-03705 BLD-Conference6/26/20026/26/20026/26/2002 12:00:00 AMPPASS
NOTE: WORK IS STOPPED...NO CONCRETE BEING PLACED AT THIS TIME ...WORK CREWS APPEAR TO BE "PULLED"...CRANE STILL IN PLACE 6/26/2002 12:29:20 PM 6/26/2002 12:32:19 PM
BLD01-03156 BLD-Final6/26/20026/26/20026/26/2002 12:00:00 AMPFAIL
Rob..ENG'G APPROVAL LETTER REQ'S STAMP...SHOULD NOTE CONFIGURATION PER DESIGN...NOT JUST WELDS. 6/26/2002 12:33:56 PM
MEC02-01725 Rough-in6/25/20026/26/20026/26/2002 12:00:00 AMPPASS
if there is a problem give him a call ###-#### PJ; chk plenums, connectors at final. 6/26/2002 2:18:24 PM
MEC02-01725 Pressure Test6/25/20026/26/20026/26/2002 12:00:00 AMPPASS
###-####
MEC02-01726 Rough-in6/25/20026/26/20026/26/2002 12:00:00 AMPPASS
pj ###-#### chk plenums, connectors at final 6/26/2002 2:17:54 PM
MEC02-01726 Pressure Test6/25/20026/26/20026/26/2002 12:00:00 AMPPASS
OK; f.p.??? 6/26/2002 2:16:49 PM