PLM02-01879
| Sprinkler (Final) | 6/25/2002 | 6/26/2002 | 6/26/2002 12:00:00 AM | A | PASS |
|
|
###-####
|
PLM02-01806
| Plumbing Rough-in | 6/25/2002 | 6/26/2002 | 6/26/2002 12:00:00 AM | P | PART |
|
|
###-#### paul draines waste and vent,s test ok need to finish water system and test and to nail plate drain,s and vent,s 6/26/2002 5:52:46 PM
|
PLM02-00505
| Final | 6/26/2002 | 6/26/2002 | 6/26/2002 12:00:00 AM | P | PASS |
|
|
fn bill ###-#### -gar door code is 5202enter Bill will fax certification for fire system double check to office 6/26/2002 5:28:41 PM
|
PLM02-01510
| Final | 6/26/2002 | 6/26/2002 | 6/26/2002 12:00:00 AM | P | NR |
|
|
Scheduled by a contractor via Hello! on 06/26/2002 at 09:55:15. Contact: ###-####. not ready 6/26/2002 3:02:26 PM
|
PLM02-01662
| Water and/or Sewer | 6/26/2002 | 6/26/2002 | 6/26/2002 12:00:00 AM | P | CANC |
|
|
###-#### DAVE SEWER TIE IN canc. by dave need inspection by public work,s for sewer tap in street 6/26/2002 3:05:55 PM
|