FIR02-00221
| INSP-Alarm Testing | 6/25/2002 | 6/26/2002 | 6/26/2002 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 06/25/2002 at 12:29:46. Contact: ###-####.
|
FIR02-00130
| INSP-Sprinkler Rough-in/Hydro | 6/26/2002 | 6/26/2002 | 6/26/2002 12:00:00 AM | P | PART |
|
|
Scheduled by a contractor via Hello! on 06/26/2002 at 10:04:09. Contact: ###-####. all items corrected from previous inspections; need to sprinkler above corridor in sub fab area 6/27/2002 7:00:48 AM
|
BLD02-00197
| FIRE-Final Inspection | 6/26/2002 | 6/26/2002 | 6/26/2002 12:00:00 AM | P | PASS |
|
|
Scheduled by Inspector: 409 On 6/26/2002 11:46:38 AM
|
BLD02-00477
| FIRE-Final Inspection | 6/25/2002 | 6/26/2002 | 6/26/2002 12:00:00 AM | P | NR |
|
|
###-#### ADRIAN couldn't test duct detectors 6/26/2002 2:27:06 PM
|