BLD01-02145
| BLD-Aging Inspection | 6/26/2003 | 6/26/2003 | 6/26/2003 12:00:00 AM | | DONE |
|
|
work complete per scope of work...unable to contact contractor 6/26/2003 9:47:34 AM 6/26/2003 9:50:10 AM
|
BLD03-00830
| BLD-Framing/Rough-in | 6/26/2003 | 6/26/2003 | 6/26/2003 12:00:00 AM | A | FAIL |
|
|
keep c/n, wip
|
BLD02-00369
| BLD-Conference | 6/25/2003 | 6/26/2003 | 6/26/2003 12:00:00 AM | A | PASS |
|
|
w/ arch 11:00; need resolve plbg issues at shear & steel beam areas. 6/26/2003 12:36:52 PM
|
BLD02-00370
| BLD-Framing/Rough-in | 6/23/2003 | 6/26/2003 | 6/26/2003 12:00:00 AM | A | PART |
|
|
pete; Phone #: ###-#### Internet Inspection Request from: Barbara Moore...walk thru w/ arch...resolve plbg issues (holes notches, etc.) need eng's detail re shearwall penetrations. 6/26/2003 5:32:26 PM
|
BLD02-02126
| BLD-Conference | 6/25/2003 | 6/26/2003 | 6/26/2003 12:00:00 AM | A | PASS |
|
|
rec'd spray-on 6/26/2003 11:27:00 AM rec'd spray-on f.p. detail, need all specs 6/26/2003 11:27:00 AM 6/26/2003 11:27:35 AM
|
BLD03-00830
| BLD-Framing/Rough-in | 6/25/2003 | 6/26/2003 | 6/26/2003 12:00:00 AM | P | NR |
|
|
scott...keep c/n, get modification per 6/26/2003 5:27:38 PM mit 6/26/2003 5:28:05 PM walk thru w/ fire insp. 6/26/2003 5:28:36 PM
|
BLD03-01172
| BLD-Conference | 6/24/2003 | 6/26/2003 | 6/26/2003 12:00:00 AM | P | PASS |
|
|
dave 5732970...w/ bldr re exits 6/30/2003 1:52:19 PM
|
BLD02-00199
| BLD-Conference | 6/25/2003 | 6/26/2003 | 6/26/2003 12:00:00 AM | P | PASS |
|
|
w/ Margie & Randy J. re shaft req's thru deck 6/26/2003 5:22:10 PM
|
BLD02-02126
| BLD-Conference | 6/25/2003 | 6/26/2003 | 6/26/2003 12:00:00 AM | P | PASS |
|
|
ok to substitute DCF for cafco300 as fire proof mat'l. 6/27/2003 6:24:03 PM
|
BLD03-00814
| BLD-Conference | 6/26/2003 | 6/26/2003 | 6/26/2003 12:00:00 AM | P | PASS |
|
|
w/ rick j. 6/26/2003 5:18:51 PM
|