PLM03-01906
| Sprinkler (Final) | 6/25/2003 | 6/26/2003 | 6/26/2003 12:00:00 AM | A | PASS |
|
|
###-#### eric
|
PLM03-01907
| Groundwork | 6/25/2003 | 6/26/2003 | 6/26/2003 12:00:00 AM | A | PASS |
|
|
###-#### kirk
|
PLM03-01187
| Plumbing Rough-in | 6/25/2003 | 6/26/2003 | 6/26/2003 12:00:00 AM | A | PART |
|
|
###-#### josh start of 24 hour pressure test on med gas zone valves 6/26/2003 11:06:40 AM
|
PLM03-01904
| Final | 6/25/2003 | 6/26/2003 | 6/26/2003 12:00:00 AM | P | NH |
|
|
###-#### bill not home no access 6/26/2003 5:17:21 PM
|
PLM02-03206
| Final | 6/26/2003 | 6/26/2003 | 6/26/2003 12:00:00 AM | P | PART |
|
|
Scheduled by a contractor via Hello! on 6/26/2003 at 7:34:35 AM. Contact: ###-####. need R.P. for smoke house unit,s caulk all fixtures to wall provide air gap on case drain,s to hub & floor sinks remove test plug from grease interceptor vent need to provide protective cover for p-trap and hot water side under handicapp lav in rest room also bolt down gas tight lides to grease interceptor contractor to recall when ready 6/26/2003 5:00:58 PM
|
PLM03-01912
| Water and/or Sewer | 6/26/2003 | 6/26/2003 | 6/26/2003 12:00:00 AM | P | PASS |
|
|
###-#### jim
|
PLM03-01915
| Water and/or Sewer | 6/26/2003 | 6/26/2003 | 6/26/2003 12:00:00 AM | P | CANC |
|
|
###-#### canc by robert 6/26/2003 4:48:22 PM
|
PLM03-01921
| Water and/or Sewer | 6/26/2003 | 6/26/2003 | 6/26/2003 12:00:00 AM | P | PART |
|
|
###-#### OFFICE UNDER GROUND SWR & WATER sewer line test ok ok to cover need to change water line to 1 1/2 as per plans 6/26/2003 3:48:40 PM
|