Inspections for the day of: Thursday, June 26, 2008.
Number of inspections: 33
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorForrest France
TitleFIRE INSPECTOR
Phone #794-1981
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR08-00375 INSP-Final Inspection6/25/20086/26/20086/27/2008 7:46:53 AMPPASS
After hours fire alarm testing passed field testing, permit finaled.
FIR08-00259 INSP-Final Inspection6/25/20086/26/20086/26/2008 5:11:24 PMPPASS
Test elevator recall. test complete. KR
BLD08-00882 FIRE-Final Inspection6/25/20086/26/20086/26/2008 4:35:38 PMPFAIL
Need to provide approved door hardware at three locations.
FIR08-00256 INSP-Supply line flush6/26/20086/26/20086/26/2008 2:56:41 PMPPART
UG fire supply line flush okayed
BLD07-02588 FIRE-Final Inspection6/26/20086/26/20086/26/2008 2:47:54 PMPNR
michael Phone #: ###-####
BLD07-02689 FIRE-Final Inspection6/26/20086/26/20086/26/2008 2:33:43 PMPFAIL
Pending completion of fire alarm system modifications.
FIR08-00203 INSP-Sprinkler Rough-in/Hydro6/25/20086/26/20086/26/2008 2:29:00 PMPDONE
Hydro test complete. KR
BLD08-00197 FIRE-Final Inspection6/25/20086/26/20086/26/2008 2:28:31 PMAFAIL
The project related fire alarm permit is not in the "issued" status-plans need to be picked up, permit paid and work completed prior to field inspection request and finished previous to building life safety inspection and final approval. Notified contractor of the situation.
BLD07-02689 FIRE-Final Inspection6/25/20086/26/20086/26/2008 2:20:43 PMADONE
Hydro test completed.KR
FIR07-00902 INSP-Sprinkler Rough-in/Hydro6/24/20086/26/20086/26/2008 2:01:58 PMPPART
Hydrostatic testing for the FDC piping completed satisfactory.
FIR07-00902 INSP-Sprinkler Rough-in/Hydro6/24/20086/26/20086/26/2008 2:00:59 PMAPART
Overhead fire sprinkler install is good for cover at the drop ceiling areas 1st floor and restrooms 2nd floor, reinspected noted defficiencies from the previous visit.
BLD07-01300 FIRE-Final Inspection6/25/20086/26/20086/26/2008 1:59:10 PMAPASS
Shell only no tenant. No sprinkler work performed. Smoke control, fire extinguishers and Any sprinkler changes will be addressed during TI. KR
BLD07-01299 FIRE-Final Inspection6/25/20086/26/20086/26/2008 1:58:16 PMAPASS
Shell only no tenant. No sprinkler work performed. Smoke control, fire extinguishers and Any sprinkler changes will be addressed during TI. KR
FIR08-00385 INSP-Sprinkler Rough-in6/26/20086/26/20086/26/2008 1:23:32 PMPCANC
Overbooked
FIR08-00018 INSP-Sprinkler Rough-in/Hydro6/25/20086/26/20086/26/2008 1:05:36 PMACANC
Overbooked
FIR08-00068 INSP-Sprinkler Rough-in6/26/20086/26/20086/26/2008 1:04:15 PMPCANC
Overbooked
FIR08-00300 INSP-Sprinkler Rough-in6/25/20086/26/20086/26/2008 1:02:42 PMADONE
Rough-in inspecction complete. Minor changes, will provide as-builts before final. KR
FIR08-00044 INSP-Final Inspection6/25/20086/26/20086/26/2008 12:48:14 PMAPASS
Main entry/exit door mag lock interconnections to the FA system passed functional test, fire alarm permit finaled.
BLD08-00835 FIRE-Final Inspection6/25/20086/26/20086/26/2008 12:45:40 PMAPASS
Fire life safety is acceptable, exit sign locations okayed.
FIR08-00316 INSP-Final Inspection6/25/20086/26/20086/26/2008 12:44:39 PMAPASS
Fire alarm field testing passed, permit finaled.
FIR08-00336 INSP-Final Inspection6/25/20086/26/20086/26/2008 12:43:47 PMAPASS
Fireproofing repaired at beams per conditions, final fire sprinkler inspection passed, permit finaled.
BLD08-00512 FIRE-Final Inspection6/25/20086/26/20086/26/2008 12:09:04 PMAPEND
This permit was to be a fire conf. Not a final. Contractor wanted a tempory occupancy. Refered him to Dave Hannamen.KR
FIR07-00672 INSP-Final Inspection6/25/20086/26/20086/26/2008 11:27:23 AMAPART
See red line notes for smoke detector to close to HVAC register, All devices have been tested except for duct smokes. KR
FIR07-00697 INSP-Final Inspection6/25/20086/26/20086/26/2008 11:16:16 AMAPASS
Overhead, forward flush and all flow and tamper switches tested.KR
FIR07-00484 INSP-Final Inspection6/26/20086/26/20086/26/2008 11:14:31 AMPPASS
Under ground completed. As per Troys inspections.
FIR08-00221 INSP-Final Inspection6/25/20086/26/20086/26/2008 11:08:18 AMAPASS
Fire sprinkler testing complete. KR
FIR08-00224 INSP-Final Inspection6/25/20086/26/20086/26/2008 11:03:38 AMAPASS
Fire alarm testing complete.KR
BLD08-00871 FIRE-Final Inspection6/25/20086/26/20086/26/2008 10:56:46 AMAPASS
Fire life safety is satisfactory, inspection passed.
FIR08-00386 INSP-Final Inspection6/25/20086/26/20086/26/2008 10:55:34 AMAPASS
Fire alarm system additions passed inspection, synchronization issue repaired while on site, permit finaled.
FIR08-00372 INSP-Final Inspection6/26/20086/26/20086/26/2008 10:53:51 AMPPASS
Tenant fire sprinkler final inspection passed, permit finaled.
BLD08-00871 FIRE-Sprinkler Rough-in6/25/20086/26/20086/26/2008 10:16:13 AMADEFR
Duplicate inspection request, was intended for the project related fire sprinkler permit work.
FIR06-00620 INSP-Alarm Testing6/25/20086/26/20086/26/2008 10:07:42 AMACANC
Overbooked
FIR08-00188 FIR-Aging Inspection6/26/20086/26/20086/26/2008 9:47:58 AM DONE
Site visit confirmed construction underway, work in progress.