Inspections for the day of: Friday, June 26, 2009.
Number of inspections: 7
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTroy Cobbley
TitleFIRE INSPECTOR
Phone #794-9483
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD09-00858 FIRE-Conference6/26/20096/26/20096/29/2009 1:38:27 PMPDONE
Spoke to Dave about emergency ligt placement in warehouse
FIR09-00084 FIR-Aging Inspection6/26/20096/26/20096/29/2009 1:36:25 PM NR
Work in progress
FIR09-00385 INSP-Final Inspection6/26/20096/26/20096/26/2009 4:08:44 PMPPASS
Permit finaled
BLD08-02395 FIRE-Final Inspection6/25/20096/26/20096/26/2009 4:06:59 PMPFAIL
The project related fire alarm and fire sprinkler permits need finaled and two exit discharge lights on the east side did not work.
BLD08-02274 FIRE-Final Inspection6/25/20096/26/20096/26/2009 4:00:19 PMAFAIL
The contractor did not have all of the city approved plans. I tried to get copies from the plan reviewer but he was gone and the plans have not been turned into archives.
FIR09-00265 INSP-Final Inspection6/25/20096/26/20096/26/2009 1:05:55 PMPFAIL
The fire alarm system tested ok. The only item needed is the as-built plans showing the interconnection with the access control egress door. Matt and I discussed what was needed over the phone.
FIR09-00239 INSP-Final Inspection6/24/20096/26/20096/26/2009 12:54:54 PMAFAIL
Provide the required clearance around the underground stub-in supply riser. Forward flush passed. All other items are passed.