BLD09-00858
| FIRE-Conference | 6/26/2009 | 6/26/2009 | 6/29/2009 1:38:27 PM | P | DONE |
|
|
Spoke to Dave about emergency ligt placement in warehouse
|
FIR09-00084
| FIR-Aging Inspection | 6/26/2009 | 6/26/2009 | 6/29/2009 1:36:25 PM | | NR |
|
|
Work in progress
|
FIR09-00385
| INSP-Final Inspection | 6/26/2009 | 6/26/2009 | 6/26/2009 4:08:44 PM | P | PASS |
|
|
Permit finaled
|
BLD08-02395
| FIRE-Final Inspection | 6/25/2009 | 6/26/2009 | 6/26/2009 4:06:59 PM | P | FAIL |
|
|
The project related fire alarm and fire sprinkler permits need finaled and two exit discharge lights on the east side did not work.
|
BLD08-02274
| FIRE-Final Inspection | 6/25/2009 | 6/26/2009 | 6/26/2009 4:00:19 PM | A | FAIL |
|
|
The contractor did not have all of the city approved plans. I tried to get copies from the plan reviewer but he was gone and the plans have not been turned into archives.
|
FIR09-00265
| INSP-Final Inspection | 6/25/2009 | 6/26/2009 | 6/26/2009 1:05:55 PM | P | FAIL |
|
|
The fire alarm system tested ok. The only item needed is the as-built plans showing the interconnection with the access control egress door. Matt and I discussed what was needed over the phone.
|
FIR09-00239
| INSP-Final Inspection | 6/24/2009 | 6/26/2009 | 6/26/2009 12:54:54 PM | A | FAIL |
|
|
Provide the required clearance around the underground stub-in supply riser. Forward flush passed. All other items are passed.
|