FIR12-00189
| INSP-Final Inspection | 6/25/2012 | 6/26/2012 | 6/26/2012 4:01:57 PM | P | PART |
|
|
Overhead rough-in passed.
|
FIR12-00189
| INSP-Sprinkler Rough-in/Hydro | 6/25/2012 | 6/26/2012 | 6/26/2012 4:00:13 PM | P | PART |
|
|
Overhead hydrostatic test completed.
|
BLD12-00508
| FIRE-Final Inspection | 6/26/2012 | 6/26/2012 | 6/26/2012 3:59:33 PM | P | NR |
|
|
Fire alarm permit final pending, noted missing building address numbers.
|
BLD12-00730
| FIRE-Final Inspection | 6/26/2012 | 6/26/2012 | 6/26/2012 3:57:43 PM | P | PEND |
|
|
Pending fire alarm permit final.
|
FIR11-00351
| INSP-Conference | 6/26/2012 | 6/26/2012 | 6/26/2012 3:56:53 PM | P | DONE |
|
|
|
FIR12-00146
| INSP-Final Inspection | 6/25/2012 | 6/26/2012 | 6/26/2012 3:56:30 PM | A | PART |
|
|
Completed new system acceptance testing. Final pending as-built plans to include revised location of the FACP, SD, and MP, post signage at the door to the control panel room, provide points map at the panel. Tenant has requested alternate proposals to the system design in order to reduce possibility of false alarms due to environmental conditions at the truck repair bays.
|
BLD11-01555
| FIRE-Final Inspection | 6/25/2012 | 6/26/2012 | 6/26/2012 3:47:22 PM | A | PASS |
|
|
Fire life safety inspection passed.
|
FIR12-00145
| INSP-Final Inspection | 6/22/2012 | 6/26/2012 | 6/26/2012 3:46:48 PM | A | PASS |
|
|
Fire alarm work passed acceptance testing after adjustments made while on site. Permit finaled.
|
FIR12-00041
| INSP-Final Inspection | 6/26/2012 | 6/26/2012 | 6/26/2012 3:44:48 PM | A | PASS |
|
|
Fire sprinkler permit work passed final inspection and walkthrough.
|