FIR12-00181
| INSP-Final Inspection | 6/26/2012 | 6/26/2012 | 6/26/2012 3:53:55 PM | P | PASS |
|
|
Permit finaled. Relay was repaired.
|
FIR12-00075
| FIR-Aging Inspection | 6/26/2012 | 6/26/2012 | 6/26/2012 3:15:32 PM | | NR |
|
|
work in progress
|
BLD11-00021
| FIRE-Sprinkler Rough-in | 6/26/2012 | 6/26/2012 | 6/26/2012 3:02:18 PM | P | FAIL |
|
|
Terry Boyle Phone #: ###-####. I left two voice messages for the contact. One letting him know I was on the way and another after looking around the job site and not making contact. I spoke to a sprinkler fitter from Treasure Valley Fire Protection and he knew nothing of a requested sprinkler inspection. I let Forrest know of the situation.
|
BLD12-00926
| FIRE-Conference | 6/25/2012 | 6/26/2012 | 6/26/2012 2:32:23 PM | A | DONE |
|
|
Vic phone #: ###-#### Questions on insulation facing at the deck were deferred to Tim in plan review.
|
FIR12-00181
| INSP-Final Inspection | 6/20/2012 | 6/26/2012 | 6/26/2012 9:12:03 AM | A | FAIL |
|
|
The relay on the south side doors failed to operated when tested. The north side detectors and relay worked correctly.
|
BLD12-00827
| FIRE-Final Inspection | 6/22/2012 | 6/26/2012 | 6/26/2012 12:00:00 AM | A | CANC |
|
|
Bill Phone #: ###-#### 6-25-12 per Liz cancel inspection not ready///dld
|