ESC13-00540
| Site Preparation | 6/21/2013 | 6/21/2013 | | | |
|
|
|
BLD11-02822
| BLD-Conference | 6/26/2013 | 6/26/2013 | 6/26/2013 4:51:39 PM | P | CANC |
|
|
|
GCB13-00062
| GCB-Framing | 6/26/2013 | 6/26/2013 | 6/26/2013 2:48:00 PM | P | PART |
|
|
Bobbie ###-#### Plans in front entry cubbie framing ok needs mech inspection and air seal inspection before insulation
|
GCB13-00065
| GCB-Footing | 6/26/2013 | 6/26/2013 | 6/26/2013 2:46:18 PM | P | PASS |
|
|
Mike ###-#### done by 316
|
GCB13-00065
| GCB-Framing | 6/26/2013 | 6/26/2013 | 6/26/2013 2:45:26 PM | P | PASS |
|
|
Mike ###-####
|
BLD13-01160
| BLD-Final | 6/25/2013 | 6/26/2013 | 6/26/2013 9:51:13 AM | A | PART |
|
|
Dave Webster Phone #: ###-#### ok for final after drive is installed ok to store items in garage
|
BLD13-01348
| BLD-Foundation | 6/25/2013 | 6/26/2013 | 6/26/2013 9:32:19 AM | A | PASS |
|
|
ryan Phone #: ###-####
|