Inspections for the day of: Thursday, June 26, 2014.
Number of inspections: 12
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorAndy J. Long
TitleEROSION INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC13-00211 General Inspection6/26/20146/26/20146/26/2014 9:35:08 AM PASS
ESC13-00211 DOC - Permit Finaled6/26/20146/26/20146/26/2014 9:35:00 AMPPASS
Home is complete. BLD finaled. ESC conditions satisfied. No further inspections required.
ESC14-00313 Complaint Inspection6/25/20146/26/20146/26/2014 9:08:36 AMAPART
Received complaint about lack of BMPs at Sage Elementary project on 6/25.

Walked site with RP Rob from Guho Corp. Checked all parking lot DIs and the MS4 DI on Parkcenter.
1. All bags had filter bag inlet protection.
2. Wattles are on-site to put around stockpiles, no stockpiles at time.
3. Area of disturbance where bank was demolished has 1.5-2 inch curbing above level of dirt, very little leaving area.
4. Water tank on site to control dust in bank area if necessary.
5. No concrete work yet but Rob said he would use a portable pan washout.

1 correction:

Clearly post permit sign and SWPPP

Other than that the site look good. No trackout to Parkcenter, no dewatering taking place. Approved.


ESC13-00966 General Inspection6/26/20146/26/20146/26/2014 8:19:25 AM PASS
Permits posted in north facing window. No sediment leaving site, yard has large curbing around it. No corrections at this time.
ESC14-00333 Random Inspection6/26/20146/26/20146/26/2014 8:11:52 AMAPASS
Ranch Market is in progress and looks to be soon be installing USTs hence the large stockpile. It is not yet inactive, so no stabilization required. Construction entrance in good condition. Permit clearly posted.
ESC13-01279 General Inspection6/26/20146/26/20146/26/2014 8:08:55 AM PASS
Lucky Harris 13 subdivision development project has permit posted, construction entrance, silt fence and inlet protection. No trackout or discharges observed.

Next inspection will check DI bags and Eckart for maintenance needs. Currently have remaining capacity.
ESC13-00974 General Inspection6/26/20146/26/20146/26/2014 8:03:52 AM PASS
Townhome is near completion. Permit posted with address. No violations observed.
ESC13-01001 General Inspection6/26/20146/26/20146/26/2014 8:03:01 AM PASS
Frame is built and ready for siding or stucco. New washout has been built for Tripplett Townhomes and has good rock entrance with lining. No trackout to Millet access way or main street.
ESC13-00755 Random Inspection6/26/20146/26/20146/26/2014 8:01:45 AMPPASS
Terraces project is in good condition. Light suppressed dust and water truck is on site, but traffic has also decrease. Silt fence perimeter has no breaches, both entrance has heavy duty rock, permit and SWPPP on-site. There is some utility work on Lysted that is not yet patched over and is a small source of loose sediment. Should be covered up soon.
ESC13-00071 General Inspection6/26/20146/26/20146/26/2014 7:57:09 AM PASS
Terraces' condo units along Council Springs are in compliance. Construction access on Council Springs has good rock entrance and signage stating "Entrance Only, No Exit" in effort to prevent trackout. Silt fence perimeter behind units is trenched and supported by security fence. Approved.
ESC13-00072 General Inspection6/26/20146/26/20146/26/2014 7:55:06 AM PASS
ESC13-00070 General Inspection6/26/20146/26/20146/26/2014 7:41:22 AM PASS